Multi-functional Round Bar Polishing Machine, Light Pole Round Tube Rust Removal and Polishing Machine_Product Center Co., Ltd._Xingtai Zhengjia Machinery Manufacturing Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Service Hotline
17631982826

Xingtai Zhengjia Machinery Manufacturing Co., Ltd.

Manufacturing and Sales: Construction Machinery...

Multi-functional Round Bar Polishing Machine, Light Pole Round Tube Rust Removal and Polishing Machine

产品Price 2600.00/Tai

最小起订Quantity:1 Tai 可售数Quantity: 10 Tai

Location:
Hebei/Xingtai
有效期至:
长期有效
最后更新:
2019-07-24 16:59
Product Details
Motor Power:
380
Model:
ZJ-200
Total Weight:
760 kg

 Three setsThree-station polishing machine

Scope:5-300mm

 

Voltage: 380V

 

Model:ZJ-200

 

Main Engine Power9.75K

 

Length: Any

 

Surface Roughness:Ra ≤0.012
 

ManufacturingAccuracy0.02mm,

 
Grinding Wheel Specifications:250*40*32mm (molds are optional based on the material of the polishing workpiece)
 
Workpiece Feeding Speed:1-12 meters/minute

 

Grinding Method: Dry/Wet grinding (optional),

 

Operation Noise:≤65 dB(A)

 

Main Unit Weight:760Kg,

 

Main unit dimensions:1900mm*960mm*1200mm


Iron pipes, aluminum pipes, stainless steel pipes, shafts, aluminum alloy, and various other metal round tubes (rods), including surface grinding, sanding, polishing, and other polishing industries. The polishing series equipment enables the product to achieve continuous processing in grinding and polishing, realizing safe, high-quality, efficient, environmentally friendly, and energy-saving mechanized and automated production. It meets the four requirements of low efficiency, high pollution, strict work schedules, and high risk in equipment maintenance for enterprises.

1) Neat: Tools, workpieces, and accessories are neatly arranged; safety devices are complete; wiring and pipelines are intact.

2) Cleanliness: Equipment both inside and out is clean; sliding surfaces, screws, gears, racks, etc., are free of oil stains and dents; no leakage of oil, water, air, or electricity from any part; chips and debris are swept up thoroughly.

3) Lubrication: Timely oiling and oil changes, with oil quality meeting specifications; oil cans, guns, cups, felt, and lines clean and complete; oil gauge bright, oil lines clear.

4) Safety: Implement a system of designated personnel and machines, as well as shift handovers; be familiar with the equipment structure and adhere to operational procedures, use equipment reasonably, maintain it meticulously, and prevent accidents.

On-site equipment maintenance management content

Equipment maintenance can be divided into daily maintenance and scheduled maintenance based on time, and into general maintenance, area maintenance, and key equipment maintenance based on repair methods. The content of maintenance work generally includes inspections, adjustments, lubrication, disassembly and cleaning, and repairs and replacements, among other on-site management and maintenance tasks.



询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
17631982826

Back to Top