Permeable brick construction techniques and quality control_News Center Co., Ltd._Permeable brick construction techniques and quality control,Shandong Xinxun Permeable Environmental Protection Building Materials Co., Ltd._Shandong Xinxun Permeable Environmental Protection Building Materials Co., Ltd._Zhongshang 114 Industry Resources Network
Shandong Xinxun Permeable Environmental Protection Building Materials Co., Ltd.

General Projects: Research and development of new materials; Sales of lightweight building materials; Manufacturing of lightweight building materials; Sales of concrete structural components; Manufacturing of concrete structural components; Construction of landscaping projects; Sales of building blocks; Manufacturing of building blocks; Sales of building materials; Technical promotion services for new materials; Information consulting services. Permitted Projects: Construction engineering; Construction engineering design; Operation and production of forest tree seedlings.

Service Hotline
13356776789


Company Information

Location:Shandong/Weifang

会员级别:采商通4

身份认证:    

我的勋章:  通过中商114认证

Business Card

  • 公司名称Shandong Xinxun Permeable Environmental Protection Building Materials Co., Ltd.
  • 联 系 人董永亮 (先生)
  • 公司电话13356776789
  • 手机号码13356776789
  • Company AddressShandong Province, Weifang City, Fangzi District, Xinzhuang Village, southwest corner of the Economic Development Zone

News Category
  • No Category

Contact Information
  • Contact person:董永亮
  • Telephone:13356776789
Home > News Center Co., Ltd. > Permeable brick construction techniques and quality control
News Center Co., Ltd.
Permeable brick construction techniques and quality control
Publish Time:2022-05-17        View Count:32        Return to List

Porous bricks, known as Dutch bricks, boast excellent permeability and are widely used in urban road construction. If you're unfamiliar with the construction techniques and quality control standards during the process, join us to get to know them better.


Requirements for the Base Layer: The method for the base layer can be operated in accordance with relevant technical specifications. After the base layer is leveled, it should be compacted using manual or mechanical rollers, followed by soil compaction.


Sub-base Requirements: The sub-base can be chosen from sand and stone sub-base or cement-lime-sand sub-base. The thickness of the pedestrian walkway sub-base should be between 100-150mm, while the thickness of the vehicle path sub-base should be between 150-200mm. Regardless of the type of sub-base used, the materials must comply with the specifications for ground construction. The sand and stone should primarily ensure that neither the sand nor the stone contains any muddy components.


Requirements for non-sand concrete base layer: Roadways or parking lots should have a non-sand concrete layer laid on top of a sand and stone or lime concrete base, with a thickness of 80-150mm. The mixing ratio for non-sand concrete should be cement 1: water 0.2: gravel 6. The gravel size should be reasonably distributed between 5-20mm. The gravel must be washed clean and free of stone dust. Dry mixed non-sand concrete should be compacted manually or mechanically to achieve a certain degree of density.


Leveling layer (adhesive layer) requirements: Use medium or coarse sand mixed with 10% white lime and spread it evenly (do not use cement). For sidewalks, sand is sufficient, with a thickness of 15-20mm.


Installation Requirements: The installation should be carried out according to the construction specifications, and the gaps between the tiles can be filled by sweeping sand into them with a broom after installation.


There are certain differences in the construction techniques for permeable bricks in various locations. The above content is for reference only and should be designed reasonably according to different sites. If there are any shortcomings, we appreciate your feedback.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13356776789