Anhui chemical plant: Demolition of chemical equipment, structural steel frame recycling, and recycling of steel structure factory buildings_SupplyPro Co., Ltd._Suzhou Haoren Environmental Recycling Resources Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Suzhou Haoren Environmental Recycling Resources Co., Ltd.

Comprehensive demolition qualifications with over 10 certifications, includin...

Soule Star Diamond Member
Consultation Hotline
15250163365

News Center Co., Ltd.

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Anhui chemical plant: Demolition of chemical equipment, structural steel frame recycling, and recycling of steel structure factory buildings
Anhui chemical plant: Demolition of chemical equipment, structural steel frame recycling, and recycling of steel structure factory buildings
品牌: 9
Manufacturer: Hao Ren
Service Content: Remove
Engineering Type: Remove
单价: 99999.00/Piece
最小起订Quantity: 1 Piece
供货总Quantity: 99 Piece
有效期至: 长期有效
最后更新: 2025-10-22 13:54
 
详细Info

Each critical step in the decommissioning process is confirmed by a designated person. Internal equipment such as process piping, towers, and containers are blown, cleaned, and replaced to remove all hazardous media. Any toxic or flammable substances remaining in equipment like tanks and kettles must be confirmed on-site. Specialized personnel must be certified and on-site supervision must be trained and certified.

We offer a sincere and cooperative approach with friends from all walks of life. Our specialized engineering and technical staff provide comprehensive services for factory equipment dismantling and recycling, including whole-factory acquisition, equipment dismantling, and whole-factory equipment recycling. Our range includes stainless steel reactors, enamel reactors, condensers, centrifuges, diaphragm automatic filter presses, vacuum transfer filters, 100-1000 square tube bundle dryers, fluidized bed dryers, stainless steel distillation pots, granulators, stainless steel condensers, concentration evaporators, stainless steel storage tanks, and more.

Before construction personnel enter the job site, a joint special safety education and technical briefing is conducted by the construction unit and the factory, to understand the harmful factors and preventive measures in the work process. Clearly brief the on-site dismantling items, assign a liaison person for the briefing, provide drawings that match the on-site condition, supply intermediate media for all equipment and pipelines, and conduct an on-site briefing. Establish responsibilities for cleaning, washing, inspection, and confirmation, and implement corresponding fire safety measures. Prior to dismantling, process handling should be conducted to ensure no residual media remains.

The site pipelines of old chemical enterprises are complex, equipment is severely corroded, and factory buildings are aging. The dismantling company and construction unit must ensure proper coordination, thoroughly understand the challenges and complex phases of the construction, and scientifically collect, transport, and dispose of any hazardous waste remaining in the equipment and pipelines, in accordance with environmental protection procedures. Maintain order and stability, ensuring a smooth process. Devote full efforts to maintaining stability during the dismantling period. This is a key guiding content and measure for our company.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15250163365