Old factory relocation, chemical plant demolition, large-scale chemical equipment removal and recycling._SupplyPro Co., Ltd._Suzhou Haoren Environmental Recycling Resources Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Suzhou Haoren Environmental Recycling Resources Co., Ltd.

Comprehensive demolition qualifications with over 10 certifications, includin...

Soule Star Diamond Member
Consultation Hotline
15250163365

News Center Co., Ltd.

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Old factory relocation, chemical plant demolition, large-scale chemical equipment removal and recycling.
Old factory relocation, chemical plant demolition, large-scale chemical equipment removal and recycling.
品牌: 9
Manufacturer: Haoren
Service Content: Remove
Engineering Type: Remove
单价: 9.00/piece
最小起订Quantity: 1 piece
供货总Quantity: 99 piece
有效期至: 长期有效
最后更新: 2025-10-22 13:55
 
详细Info

Contract hotel demolition, factory relocation, factory relocation, contracted demolition and removal projects, removal and recycling of mobile rooms, power distribution rooms, electrical cables, industrial equipment, refrigeration equipment, air conditioning systems, production lines, etc. Large indoor demolition and decoration ceiling, ventilation systems, partitions, wall-breaking, etc. Outdoor structural billboards, neon signs, decoration and renovation, etc. Building demolition, contracting various complex structures and high-difficulty buildings. Various chimneys, water towers, iron chimneys, iron towers, rooftop towers, single-pole towers, and television towers for removal and recycling.

Vehicles for waste removal should be parked within the construction closure area; they must be enclosed or covered with tarpaulins, and a designated person should direct their entry and exit. The operation time for waste removal should comply with relevant regulations, ensuring no work is conducted at night to minimize noise impact on the surrounding environment. When dismantling, if flammable, combustible materials, or insulating materials are encountered, open flame operations are strictly prohibited. A fire lane should be set up at the construction site and kept clear. The site's roads should remain open in both directions to ensure fire vehicles can promptly access the incident site for rescue operations.

For many years, we have consistently prioritized safety. The company has established a detailed and stringent safety management system, and successfully passed the ISO 28001:2001 Occupational Health and Safety Management System certification in 2012. We boast a comprehensive quality management system, strictly adhering to specifications and standards in construction to meet the requirements of our clients. Our company was one of the earliest in the industry to pass the ISO 19001:2000 Quality Management System certification.

Our company has undertaken numerous construction projects, establishing a solid reputation in the industry. We possess a large inventory of advanced machinery and equipment, as well as a team of skilled engineers, experienced construction managers, and well-trained workforces. We undertake demolition and removal projects, including chemical plant demolition, factory demolition, hotel demolition, workshop demolition, steel structure demolition and recycling, large-scale decoration removal, renovation removal, and restoration of raw buildings to their original state.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15250163365