We specialize in dismantling.Factory, restaurant, supermarket, hotel, dance hall, restaurant, leisure center, school, private enterprises, etc.Interior and exterior demolition, returning to bare bones house.Highly purchase back surplus goods in warehouses, idle equipment, and scrap materials. The aim is to activate idle assets and utilize idle funds, turning waste into treasure, and benefiting the people. Our company adheres to the business philosophy of "honesty as the foundation, mutual benefit, and preferential prices" and is dedicated to serving you sincerely. Long-term recycling includes: restaurant equipment (cooking utensils, tables and chairs, electrical appliances), bar equipment (stage lighting, sound tuning equipment), Western-style restaurants, and other equipment; obsolete electronic components, hardware waste, plastic; large quantities of copper, aluminum, iron, and various metal materials; central air conditioners of 5-600 units, split-type air conditioners; equipment and machines for bakeries, leisure centers, computers, elevators, motors, electrical cabinets, circuit boards, generators, transformers, voltage regulators, and surplus in warehouses.

Restaurant Equipment: Stainless steel refrigerators, stoves, prep stations, workbenches, sinks, shelves, purification equipment, ice machines, beverage coolers, iron beds, dining tables and chairs, dishes, air conditioners, color TVs, stage lighting, speakers, amplifiers, equalizers, effects processors, mixing consoles, wireless MCs, turntables, laser lights, etc. Air Conditioning Equipment: Split air conditioners, central air conditioners, window air conditioners, screw compressors, centrifugal compressors, chilled water units, air handling units, etc. Factory Equipment: Production machinery and equipment, assembly lines, office equipment, plastic and metal raw materials, waste, finished products, semi-finished products, electronic integrated circuit finished and semi-finished products, ICs, transistors, diodes. Supermarket Equipment: Cash registers, electronic scales, various shelves, storage cabinets, freezers, display cabinets, etc. Electrical and Mechanical Equipment: Injection molding machines, die-casting machines, stamping presses, milling machines, grinding machines, lathes, EDM machines, bending machines, engraving machines, elevators, generators, transformers, voltage regulators, electrical cabinets, motors, etc., intermediaries rewarded well, long-term validity.。

Engineering Demolition Scope: Removal of existing pipelines, existing electrical fittings, gas, removal, existing mesh gates, etc., (control dust and noise during demolition, dispose of waste materials promptly). Installation of Channels: The channels for this engineering project use aluminum composite pipes, with the connection method being threaded. The gate materials are of high quality and durable. 1. Aluminum composite pipes and their fittings should comply with the requirements of the relevant national standards currently in force, be certified by a legally qualified quality inspection department, and bear an export permit and a certificate of conformity with clear markings indicating the manufacturer's name and specifications. The packaging should include batch number, quantity, production date, and inspection code. 2. The fittings for aluminum composite pipes should be supplied by the manufacturer. 3. Cold water pipes cannot be used for hot water pipes. The usage code is "L" for cold water pipes, with a white outer layer; the usage code is "R" for hot water pipes, with an orange-red outer layer.
4. Aluminum composite tube materials, the color of the tube should be consistent, both the inner and outer walls should be smooth and even. Free from bubbles, cracks. No cracks, peeling, scratches, dents, etc. Nominal outer diameter not exceeding 32mm coiled materials, after straightening, there should be no obvious bending deformation after cutting the section. 5. Working pressure test of aluminum-plastic composite pipe: immerse the pipe material in water, seal one end, and introduce 10MPa compressed air into the other end, maintain pressure for 3 minutes. The pipe should not have any bulging, cracks, or leaks. All connecting parts and valves should have corresponding quality certification documents, inspection reports, etc. The packaging should be intact, free from sand holes, cracks, damage, misalignment, loose connections, incomplete threads, and inaccurate angles. The materials to be inspected should be sent for sampling under the supervision of the supervisor before use. After unpacking, cut the paper according to the number of pipes and the length of the pipes. Mark the positions, align the lines, and conduct safety technical briefing for the workers. After pre-arranging the dimensions and marking the positions, and ensuring that all aspects meet the design, technical briefing, and comprehensive layout requirements, the materials can then be cut and processed.




