Our company undertakes demolition, acquisition, and construction projects.Power plants, chemical factories, cement plants.Refinery、Fertilizer factoryAluminum factoryWait a minute. Recycle.Engine assembly, boilers and boiler rooms, turbine houses, cooling towers, chimneys, concrete bridge equipment and building demolitionCompany holds full qualifications in petrochemical industry、Environmental EngineeringCivil engineering, highway engineering, electrical engineering, general contracting for municipal public works projects; specialized contracting for steel structure projects. House, bridge, factory, and equipment demolition services (excluding blasting). Civil engineering demolition and cleanup; earth and stone excavation and transportation; land leveling for construction projects. Building demolition projects; earthwork projects. Demolition and reinforcement of buildings and structures; indoor and outdoor equipment and decoration demolition; foundation and substructure treatment; concrete pavement crushing and renovation projects; recycling of production waste materials, construction waste, machinery and electrical equipment, electronic products, and electrical appliances.Wait a moment.

Our company's necessary preparations before dismantling the chemical plantBased on the characteristics of the construction work, both parties should conduct a safety technical briefing for the relevant operation managers. The safety reliability of the machinery and tools, protective equipment (insulated shoes, insulated gloves, respiratory protective equipment, safety helmets, safety belts, safety ropes, etc.) used in the construction work must be inspected and confirmed. All operations during the dismantling of the installation must strictly follow the operation permit system (including blind flange removal, maintenance, firework, temporary electricity use, earthwork, high-altitude work, confined space work, etc.) and the corresponding safety and technical specifications. All construction personnel must operate with a valid certificate. Equipment, containers, and pipelines containing flammable, toxic, or corrosive substances should be thoroughly cleaned and flushed to ensure that no residue or excess gas remains inside, and the sampling analysis results should meet the safety and technical requirements. Hazard identification, risk assessment, and necessary control measures must be implemented for the equipment to be dismantled. The construction roads should be unobstructed, lighting should meet requirements, and equipment and materials should be able to be transported to the site. The electricity, water, and gas used for construction on site should meet the construction requirements. Various record forms should meet the quality record requirements for operations. The system has been stopped, the medium replacement is complete, and handover procedures have been completed. The warning lines at the construction site have been established, and safety supervisors are in place. Protective equipment is worn correctly, and fire protection facilities are in place.Safety is our company's topmost principle.





