Chao Hu undertakes chemical factory demolition projects, equipped with demolition qualifications. The on-site pipelines of old chemical enterprises are complex, equipment is severely corroded, and factory buildings are aging. Demolition companies and construction units must ensure proper coordination, thoroughly understand the difficulties and complex stages of construction, and scientifically collect, transport, and dispose of hazardous waste remaining in equipment and pipelines according to environmental protection procedures. Ensure proper and orderly handling to maintain stability. Devote full efforts to maintaining stability during the demolition period. This is a key guidance content and measure for our company.
We are committed to sincerely collaborating with friends from all walks of life with a positive and open attitude. Our specialized engineering and technical personnel provide comprehensive services for the dismantling and recycling of entire factory equipment, including whole factory acquisition, equipment dismantling, and entire factory equipment recycling. Our offerings include stainless steel reactors, enamel reactors, condensers, centrifuges, diaphragm automatic filter presses, vacuum pressure filter machines, 100-1000 square tube bundle dryers, fluidized bed dryers, stainless steel distillation pots, granulators, stainless steel condensers, concentrators, and stainless steel storage tanks, etc.
After accepting the project, we thoroughly understand the owner's requirements for the demolition of underground pipelines and adjacent structures, and hold a technical and quality briefing meeting involving personnel from design, construction, supervision, and construction units before the project implementation. Prior to project construction, we compile the implementable construction organization design, construction plans, technical measures, quality assurance system for engineering quality, quality plan, quality control procedures, and quality assurance measures in accordance with the construction technical specifications.
Chaohu Undertakes Chemical Factory Demolition Projects, with Qualification for Chemical Demolition. Preparations for Water Washing: A washing plan must be written before the system is flushed. Equipment and pipelines are installed, pressure tests pass, and are checked for accuracy against the PID diagrams. Temporary washing pipelines are installed as per the washing plan requirements. The washing personnel must be familiar with the washing plan. Electrical and instrument equipment for water washing are operating normally. Methods and key points for water washing: Strictly follow the segmented flushing program in the water washing plan, starting with the main branch first and then the branches, i.e., after each washing outlet passes and is reset, the subsequent system's flushing can proceed.