Liyang Chemical Plant Demolition Company undertakes chemical plant demolition and recycling services. For many years, we have always prioritized safety in our operations. The company has established a detailed and stringent safety management system, and successfully passed the ISO28001-2001 Occupational Health and Safety Management System certification in 2012. We have a comprehensive quality management system and strictly adhere to standard specifications in construction, with the aim of meeting our clients' requirements. Our company was one of the first in the industry to pass the ISO19001-2000 Quality Management System certification.
We are committed to sincerely collaborating with friends from all walks of life with a positive and open attitude. Our specialized engineering and technical staff provide comprehensive services for the dismantling and recycling of entire factory equipment, including whole factory acquisition, equipment dismantling, and whole factory equipment recycling. Our offerings include stainless steel reactors, enamel reactors, condensers, centrifuges, diaphragm automatic filter presses, vacuum transfer filter machines, 100-1000 square tube bundle dryers, fluidized bed dryers, stainless steel distillation pots, granulators, stainless steel condensers, concentration evaporators, stainless steel storage tanks, and more.
Establish a technical management system with the technical person in charge as the core at the beginning of the demolition project. According to the project characteristics and construction specifications, formulate safe, reasonable, and economic technical plans to guide construction. Conduct on-site inspections to promptly identify and resolve issues on the construction site. Special attention should be given to the preparation of construction technical measures for unique sections, difficulties, key points, and focal areas. All construction organization designs must be reviewed by the company's chief engineer and project chief engineer before reporting them to the construction unit and supervisory unit for approval. Subsequently, supplement and perfect the construction organization design based on the approval comments.






