Installation Methods for Solar PV Mounts_News Center Co., Ltd._Installation Methods for Solar PV Mounts,Guosheng (Tianjin) Steel Manufacturing Co., Ltd._Guosheng (Tianjin) Steel Manufacturing Co., Ltd._Zhongshang 114 Industry Resources Network
Guosheng (Tianjin) Steel Manufacturing Co., Ltd.

Photovoltaic solar mounting structures, seismic-resistant brackets, CZU steel beams, etc.

Consultation Hotline
13902170000  13902170000
 

Company Information

Location:Tianjin

会员级别:数字营销3

身份认证:   

我的勋章:  通过中商114认证 [诚信档案]

Business Card

  • 公司名称Guosheng (Tianjin) Steel Manufacturing Co., Ltd.
  • 联 系 人姜曼 (女士)
  • 公司电话13902170000
  • 手机号码13902170000
  • Company AddressDatuang Village, Datuzhuang Town, Jinghai District, Tianjin City, 200 meters south of the intersection of Tuanwang Road and Jinyang Road
home > News Center Co., Ltd. > Installation Methods for Solar PV Mounts
News Center Co., Ltd.
Installation Methods for Solar PV Mounts
Publish Time:2023-07-05        View Count:31        Return to List

Installation of photovoltaic support structures:

The foot bolt holes of the front and rear columns are placed on the foot bolts on the already constructed concrete foundation; check if the front and rear columns are correctly positioned; adjust the centerlines of the length direction of the front and rear columns to align with the column centerline of the concrete foundation, using a level or a level tube to measure and adjust the horizontal alignment of the front and rear columns, and using a plumb bob to adjust the verticality of the columns. If there is a deviation in the elevation of the pile foundation surface, level the front and rear columns with shims and then securely tighten the foot bolts. The shims must be welded to the foot base of the front and rear columns. Check the flatness of the bracket base and diagonal errors. Adjust the front and rear beams to ensure the errors are within the specified range, and then tighten the bolts with a wrench.

Beam Installation:

The beam position is determined by the end length according to the design specifications, with the beam bolts securely fastened to ensure a level and vertical alignment, and reliable connections. To ensure the squareness of the battery panels fixed on the beam, the beam should be squared in advance, with diagonal measurements and adjustments made to ensure diagonal deviations are within the allowable limits.

After installing the pillar diagonal tie rod, tighten the bolt to ensure that all components of the entire bracket are uniformly stressed.

Under the premise of meeting the current national regulations, the installation of the support structures prioritizes the safety and operational maintenance of the process, while also considering the needs of other relevant professions. For photovoltaic support structures under different conditions, reasonable connection forms are selected to strive for a design that achieves: safety, suitability, economy, rationality, and aesthetics. This design aims to adapt and reflect the requirements of modern industrial civilization production, while also attempting to minimize the cost of construction. This ensures that the limited investment can quickly form production capacity and achieve economic benefits.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13902170000