Installation and Commissioning Methods for Polypropylene Storage Tanks_News Center Co., Ltd._Installation and Commissioning Methods for Polypropylene Storage Tanks,Shandong Taiqihe New Materials Technology Co., Ltd._Shandong Taiqihe New Materials Technology Co., Ltd._Zhongshang 114 Industry Resources Network
Shandong Taiqihe New Materials Technology Co., Ltd.

Polypropylene storage tanks, PP storage tanks, polypropylene reactors, polypropylene graphite heat exchangers, polypropylene water jet vacuum units, etc., chemical equipment

Consultation Hotline
13953333229  13953333229
 

Company Information

Location:Shandong/Zibo

会员级别:标王3

身份认证:   

我的勋章:  通过中商114认证 [诚信档案]

Business Card

  • 公司名称Shandong Taiqihe New Materials Technology Co., Ltd.
  • 联 系 人 李学辉 (先生)
  • 公司电话13953333229
  • 手机号码13953333229
  • Company AddressShandong Province, Zibo City, Zichuan District, Shuangyang Town, Poxi Village, 600 meters east of the village committee
home > News Center Co., Ltd. > Installation and Commissioning Methods for Polypropylene Storage Tanks
News Center Co., Ltd.
Installation and Commissioning Methods for Polypropylene Storage Tanks
Publish Time:2023-02-16        View Count:23        Return to List

Proper installation and tuning of polypropylene storage tanks directly impact the effectiveness of the equipment. Many users of newly purchased tanks are unaware of how to install and tune them. The following content will provide a detailed introduction to the installation and tuning methods of this equipment.

One: The horizontal installation of polypropylene storage tanks is carried out on a solid foundation using pre-buried anchor bolts.

Under the guidance of professionals, ensure the proper installation of equipment, electrical control devices, and accessories. Check if the pipelines are clear and the installed instruments are accurate, and for any signs of damage. Prior to startup, inspect for any persons or objects that could interfere with the normal operation of the equipment inside, outside, and in the surrounding area to avoid any hazards.

After installation, a few seconds of trial operation should be conducted first to ensure there are no electrical shorts or abnormal noises before proceeding with a brief trial run.

If the agitator tank is equipped with a mechanical seal, before the main unit is started, an appropriate amount of No. 10 or sewing machine oil should be injected into the sealant lubrication groove, and cooling water should be introduced into the cooling cavity of the seal to ensure the seal device receives proper lubrication and cooling. The seal is not adjusted at the factory; after installation, adjust the seal to the correct position according to the installation and operation manual to ensure normal operation.