Lightweight aggregate concrete construction technology_News Center Co., Ltd._Lightweight aggregate concrete construction technology,Shaanxi Easywin Lightweight Concrete Engineering Co., Ltd._Shaanxi Easywin Lightweight Concrete Engineering Co., Ltd._Zhongshang 114 Industry Resources Network
Shaanxi Easywin Lightweight Concrete Engineering Co., Ltd.

Lightweight Concrete Construction | Foam Concrete Construction | Cellular Concrete Construction | Cement-Based Self-Leveling | Gypsum-Based Self-Leveling

Consultation Hotline
18821676737  18821676737
 

Company Information

Location:Shaanxi/Xi'an

会员级别:数字营销4

身份认证:   

我的勋章:  通过中商114认证 [诚信档案]

Business Card

  • 公司名称Shaanxi Easywin Lightweight Concrete Engineering Co., Ltd.
  • 联 系 人王经理 (先生)
  • 公司电话18821676737
  • 手机号码18821676737
  • Company Address1st Floor, Building A-1, Diamond Store of Daming Palace Building Materials and Home Appliances, Weiyang District, Xi'an City, Shaanxi Province
home > News Center Co., Ltd. > Lightweight aggregate concrete construction technology
News Center Co., Ltd.
Lightweight aggregate concrete construction technology
Publish Time:2022-08-12        View Count:28        Return to List

Lightweight aggregate concrete construction technology

The application method for the dry-mixed composite lightweight aggregate concrete cushion layer during construction is relatively simple:

Firstly, for the preliminary treatment: Process the subfloor of the floor before laying the composite lightweight aggregate mat, ensuring that all impurities on the bonding subfloor are thoroughly cleaned.

Next, locate the control line for the elevated elastic level, typically measured downward from the +50cm horizontal elevation line on the wall to determine the sublayer elevation. If possible, mark this line on the walls around the perimeter.

Next is mixing: First, add an appropriate amount of water to the blender, then add one bag of pre-mixed base material powder, mix until smooth, and then add composite lightweight aggregates, continue mixing to form a uniform mixture.

Next, spread the mixed composite lightweight aggregate sublayer using a shovel, laying it on the base layer. Level it with the finished leveling blocks, making it 3mm higher than the leveling pile, and then compact it with a flat vibratory tamping machine. If the thickness is thin, you can compact it with a shovel and a special wooden tamping block as you lay it, and immediately level it with a large ruler. Smooth it out with a wooden trowel or roll it flat with an iron roller. Complete all operations within 3 hours.