Shandong Jinrui Shipbuilding's 1,000 cubic meters per hour dredging ship project for reservoir sediment removal and treatment_News Center Co., Ltd._Shandong Jinrui Shipbuilding Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Shandong Jinrui Shipbuilding Co., Ltd.

Suction dredgers, sediment clearance vessels, sand pumpers, dredging ships, c...

13406669918
 

News Category
  • No Category

Contact Information
  • Contact person:张振伟
  • Telephone:13406669918
  • Mobile:13406669918
  • Address:Qingzhou City, Miyi Town, Zhangyin Village, South of Shandong Province
Home > News Center Co., Ltd. > Shandong Jinrui Shipbuilding's 1,000 cubic meters per hour dredging ship project for reservoir sediment removal and treatment
News Center Co., Ltd.
Shandong Jinrui Shipbuilding's 1,000 cubic meters per hour dredging ship project for reservoir sediment removal and treatment
Publish Time:2024-03-05        View Count:44         Return to List

Dredge ShipPoints to Note During Production

The company adheres to the corporate spirit of survival through quality, market through credibility, and development through innovation, upholding an honest and pragmatic business philosophy, committed to providing high-quality products to a wide range of consumers.Dredging shipImportant Points to Note During Production - Check them out with us now!

After starting the dredger engine and running at idle for about 10 minutes, once the water temperature, oil temperature, and oil pressure reach the specified requirements, production can begin. With the engine ready to drive the sand pump and an operator in the control room, first, open the 24V main power switch on the dredger's operating cabinet. Then, lower the bridge and suction pipe using the winch on the dredger's bridge, allowing the cutter to sink into the water. Next, start the冲洗水泵 to flush the water. After that, engage the gearbox with the sand pump using the combined switch on the control panel to make the engine drive the gearbox and operate the sand pump. Gradually increase the engine to the specified speed.

During dredger construction and production, the engine room crew should observe the engine room by smelling, listening, looking, and touching to ensure conditions are normal. Check for any strange odors, unusual noises, and whether the engine's monitoring instruments are functioning correctly. Inspect for oil leaks in the hydraulic system, water leaks in the cooling system, and any "three leaks" from the engine. These include water leaks, oil leaks, and gas leaks. Feel the temperature and vibration of moving parts to assess their condition.


 Click submit means you agree to《Service terms》《Privacy policy》

13406669918