Shandong Jinrui Shipbuilding's 5,000 cubic meters per hour electric dredger for the Dongting Lake sediment removal and treatment project_News Center Co., Ltd._Shandong Jinrui Shipbuilding Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Shandong Jinrui Shipbuilding Co., Ltd.

Suction dredgers, sediment clearance vessels, sand pumpers, dredging ships, c...

13406669918
 

News Category
  • No Category

Contact Information
  • Contact person:张振伟
  • Telephone:13406669918
  • Mobile:13406669918
  • Address:Qingzhou City, Miyi Town, Zhangyin Village, South of Shandong Province
Home > News Center Co., Ltd. > Shandong Jinrui Shipbuilding's 5,000 cubic meters per hour electric dredger for the Dongting Lake sediment removal and treatment project
News Center Co., Ltd.
Shandong Jinrui Shipbuilding's 5,000 cubic meters per hour electric dredger for the Dongting Lake sediment removal and treatment project
Publish Time:2024-03-05        View Count:42         Return to List

The role of dredgers in river sediment removal

As summer approaches each year, continuous heavy rains often lead to flooding disasters, compounded by the lack of management over issues like river siltation. This has turned rivers into accomplices in these disasters, severely threatening people's property safety. Therefore, the dredging of rivers and lakes becomes particularly important. ElectricThe cutter suction dredger, utilizing high-speed cutters, can rapidly break through the riverbed's surface silt, followed by the use of sand pump to transport the silt. The fully electric drive system is energy-efficient and environmentally friendly.

In fact, during the flood control efforts, there's absolutely no need to worry about this issue.When preparing for construction, a detailed understanding of the terrain is essential, and the transfer and placement of equipment also requires thorough planning in advance.


 Click submit means you agree to《Service terms》《Privacy policy》

13406669918