China State Construction Engineering Corporation (CSCEC) - Data Collection and Business Signal Coverage in Residential Substation; Mobile Signal Coverage in High-Voltage Substation_News Center Co., Ltd._Shandong Zhengfan Information Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shandong Zhengfan Information Technology Co., Ltd.

5G Mobile Signal Installation, Mobile Signal Coverage Solutions, Community Ga...

Consultation Hotline
18660411987

Product Categories
  • No Category
Home > News Center Co., Ltd. > China State Construction Engineering Corporation (CSCEC) - Data Collection and Business Signal Coverage in Residential Substation; Mobile Signal Coverage in High-Voltage Substation
News Center Co., Ltd.
China State Construction Engineering Corporation (CSCEC) - Data Collection and Business Signal Coverage in Residential Substation; Mobile Signal Coverage in High-Voltage Substation
Publish Time:2022-10-14        View Count:199        Return to List

China State Construction Engineering Corporation (CSCEC) South Second Ring Road Lingshoucheng Project


Data Collection for Power Distribution Rooms


Relying on the transmission of 2G, 3G, 4G, or 5G mobile signals


Please specify the required network, and feel free to communicate with our factory engineers for details.


This system covers both source and non-source components.


The communication cable and antenna components assembly is achieved.


To achieve power distribution, branching and merging, routing, and branching


And transmission and access coverage capabilities.


src=http___p9


Engineers have completed testing the base station parameters surrounding the project perimeter.


Select equipment and accessories that meet the specified parameters.


During the construction process, antennas and other components


Mounted on ceilings or walls


There are no direct obstructions nearby.


Indoor antenna bracket installation method


Ensure there are no direct obstructions around the antenna.


The main lobe of the antenna is directly pointed towards the target coverage area.


Stay as far away from the fire sprinkler heads as possible.


The company has tested the coverage radius of the launch distance.


Cabinet for Avoiding Interference from Strong Magnetic Items


Achieved stable coverage in the end.


_____________________________



The principle of wiring follows the 380V standard, with the capacity of electrical cables exceeding 20kW. Both parties should cut two separate conduits or a single bridge in the grounding conduit channel, separated by metallic baffles, and the parallelism should be ≤10M, with the minimum spacing being 10MM.




 Click submit means you agree to《Service terms》《Privacy policy》

18660411987