China State Construction Engineering Corporation (CSCEC) South Second Ring Road Lingshoucheng Project
Data Collection for Power Distribution Rooms
Relying on the transmission of 2G, 3G, 4G, or 5G mobile signals
Please specify the required network, and feel free to communicate with our factory engineers for details.
This system covers both source and non-source components.
The communication cable and antenna components assembly is achieved.
To achieve power distribution, branching and merging, routing, and branching
And transmission and access coverage capabilities.

Engineers have completed testing the base station parameters surrounding the project perimeter.
Select equipment and accessories that meet the specified parameters.
During the construction process, antennas and other components
Mounted on ceilings or walls
There are no direct obstructions nearby.
Indoor antenna bracket installation method
Ensure there are no direct obstructions around the antenna.
The main lobe of the antenna is directly pointed towards the target coverage area.
Stay as far away from the fire sprinkler heads as possible.
The company has tested the coverage radius of the launch distance.
Cabinet for Avoiding Interference from Strong Magnetic Items
Achieved stable coverage in the end.
_____________________________
The principle of wiring follows the 380V standard, with the capacity of electrical cables exceeding 20kW. Both parties should cut two separate conduits or a single bridge in the grounding conduit channel, separated by metallic baffles, and the parallelism should be ≤10M, with the minimum spacing being 10MM.