Turbulent mixing aeration unit_SupplyPro Co., Ltd._Henan Runyang Environmental Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Henan Runyang Environmental Technology Co., Ltd.

Wastewater Treatment Equipment; Sewage Treatment Equipment; Sewage Purificati...

13303719879

Turbulent mixing aeration unit

产品Price 3000.00/An

最小起订Quantity:1 An 供货总Quantity: 9999 An

用手机扫描二维码直达商品手机版
MobileView details
Location:
Henan/Zhengzhou
有效期至:
长期有效
最后更新:
2022-12-16 17:27
Product Details

Brand

Specs

Available for customization

Variety

Aeration Device

Application

Water Treatment

Origin

Henan

Available Markets

National

Material

   ABS

2. Specifications and Models

   Φ260。 

3. Product Overview

The spiral mixing aeration device employs a multi-layer spiral cutting design for oxygen aeration. As the air flow enters the aeration unit, it first passes through a double-spiral cutting system before entering the lower multi-layer serrated aeration head, where it undergoes multi-layer cutting to reduce bubbles into microbubbles. This significantly enhances the oxygen utilization rate, characterized by even aeration and high oxygenation efficiency.

4. Product Advantages and Features

Simple structure, easy to install.

High oxygen utilization rate.

Performance is stable.

Pores are not easily clogged, and sewage does not backflow.

Ring-shaped stress distribution, even load bearing, long service life.

Easy installation and maintenance.

System prices are affordable.

5. Product Technical Specifications

Serial Number

Model and Specifications

Service Area

m³/h. pieces

Airflow Rate

m³/h. each

Note

2

Φ260

0.4-0.8

2-5


Engineering site photos

6. Installation Program Overview

All pipes are cut to size according to the drawings and arranged in the positions indicated by the drawings.

Mark lines on the pipe according to the position of the aerator and each branch pipe, then bond the saddle bracket and the substitute three-way fitting.

After bonding, leave it for about a day, then drill holes after the adhesive has cured (press down harder during bonding to ensure full bonding between the pipe fittings and the pipe).

Align the main pipe, level it, position the adjustable bracket at the lowest Z position, and determine whether to secure it with expansion bolts based on the on-site conditions.

Install all branch pipelines with adjustable brackets, without adhesive, fit all branch pipelines in place, adjust the height of all adjustable brackets (no need to fix).

Install several aeration heads on each branch pipe and observe the level.

All pipes in each loop must be on a single horizontal line, and the loops themselves must be on a single plane. Use a ruler to draw lines on each branch pipe, main pipe, and loop branch, making the lines as long as possible.

Disassemble each loop.

Clean the pipe, apply glue, and install the pipe.

Bore holes and secure adjustable brackets on the branch pipe with expansion screws.

Install the turbine mixing aeration unit.

7. After-Sales Service & Maintenance

7.1 Common Faults of Turbulent Mixing Aerator and Solutions

Serial Number

Fault Phenomenon

Fault Cause

Solution

1

There are some with large bubbles.

Fitting adhesive leakage

Inspect bonding points, re-inject or re-bond

2

Aerator detachment

Aerator not tightened properly

Re-tighten the aeration device

3

Bubble aeration produces a variety of sizes of water spray.

Adjustable stand not leveled

Re-levelable adjustable bracket

7.2 Procedures and steps for routine maintenance, testing, and replacement of parts:

Daily inspect the aeration pond and operate strictly according to the operational procedures. In case of uneven aeration and localized large bubble phenomena, refer to the previous section in this maintenance manual for analyzing the fault cause and troubleshooting.

7.3. Usage and Others

After the aerator is installed in the empty pond, it must be filled with water promptly to prevent damage from sunlight exposure, welding sparks, and sharp objects falling into the pond.

This product is not suitable for heavy loads, should not be stored outdoors, and should be kept away from fire sources and hard objects to prevent damage.

7.4 After-Sales Service Measures

One-year warranty from the date of acceptance inspection; free repair within the warranty period (for products within the warranty scope). Provide tracking service for the equipment supplied by the company.

Upon receiving the customer's notice, a response is guaranteed within 1 hour, and on-site arrival is ensured within 48 hours of Z evening.

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13303719879

Back to Top