RuiPing Water Supply Integrated Pump Box Manufacturer_SupplyPro Co., Ltd._Yancheng Runping Water Supply Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Yancheng Runping Water Supply Equipment Co., Ltd

Integrated Pre-Made Pump Station, Wastewater Lift Pump Station, Skid-Mounted ...

18036281668
 

Product Categories
Home > SupplyPro Co., Ltd. > RuiPing Water Supply Integrated Pump Box Manufacturer
RuiPing Water Supply Integrated Pump Box Manufacturer
品牌: Ruanping Water Supply
Specs: Made-to-Order
Application: Water Supply & Drainage
Work pressure: Atmospheric Pressure
单价: 8000.00/Tai
最小起订Quantity: 1 Tai
供货总Quantity: 10000 Tai
有效期至: 长期有效
最后更新: 2023-03-27 15:55
 
详细Info

Detailed Description:

    Buried pump package

Now, let me tell you about Runping's buried cable.Integrated pump in boxWhat sets it apart from standard water tanks:

1. Standard water tanks are welded, while the integrated submersible pump water tanks are bolted together. There are a total of 3 types of integrated submersible pump water tanks.

Galvanized steel plate, formed by stamping, with each stamping block of the stamping plate bolted together.

(2) SUS304 stainless steel material, formed, the forming blocks of each stamping panel are connected by bolts.

(3) Composed of 3mm galvanized steel and 0.4mm stainless steel composite, these materials vary significantly in price.

Submersible pump integrated water tankWith the ordinaryStainless Steel Water TankConstruction plans vary, and I'll introduce them to you below.Submersible pumpConstruction Plan for Integrated Water Tank

To ensureSubmersible pump and tank integrated unitThe water tank meets high design standards during production. Our company operates in accordance with the enterprise standards issued by the Jiangsu Provincial Administration for Quality and Technical Supervision, with the serial number Q/320925YLP001-2013.

Tank specifications: 25m x 18m x 2.5m = 1125m³

Sheet specifications: Top panel 2.0mm, Side panels 3.0mm/3.0mm/3.0mm, Bottom panel 3.0mm

Anti-float buried water tank construction procedure:

Base panel cutting → Base panel installation → Base panel connection → Base panel sealing inspection → Side panel cutting → Side panel connection → Sealing inspection at side panel connection → Roof panel cutting → Roof panel connection → Roof panel installation

1. According to the design requirements of the tank specifications and models, we use lubricated assembly-style tank module sheets in the factory. First, we mark the sheets, then send them to the cutting machine to be cut into 106x106cm blocks. After cutting the sheets, we trim the four corners to 90-degree angles, and then send them to the hydraulic press to mold them into 100x100cm and 50x50cm concave-convex panels, with all flanges being 90 degrees.

2. Upon arrival on-site, first assemble the forming panels using bolted and sealed connections with bolts and gaskets. Connect the panels according to the tank's dimensions of length x width x height, assembling them into several tank panels or dividing them into sections for bolted connections based on the tank's length and height. The top layer of the water tank is connected with bolts.

3. After assembling several panels, prepare for the bottom assembly connection. When bolting the bottom panel, the manufacturer of the buried box pump integrated unit should first seal the bottom panel dimensions, arrange the bottom plate for sealing connection on the bottom panel, and then perform fire oil inspection and visual inspection on the sealed section to prevent loose seals and other phenomena.

4. After the base panel is connected, proceed to join the wall panel with the base panel. Bolt connection involves first placing one side's code on the base of the water tank, followed by the codes on all four sides. Adjust the flanges for connection, with the general relative angle being below 2mm. The connection should be straight, and the corners must have a 90-degree connection between the base and the wall.

5. After the bottom of the water tank is sealed to the wall with bolts and gaskets, it is then connected to the top and wall, with the edges aligned to form a basically straight horizontal line. According to customer requirements, the manhole of the water tank is connected at the specified location, usually installed near the float ball of the inlet hole.

6. After the water tank connections are sealed, proceed to open the inlet, outlet, overflow, drain, fire hydrant, and install the ladder near the manhole.




询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

18036281668