Water Supply by Runping, Underground Integrated Tank and Pump System_SupplyPro Co., Ltd._Yancheng Runping Water Supply Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Yancheng Runping Water Supply Equipment Co., Ltd

Integrated Pre-Made Pump Station, Wastewater Lift Pump Station, Skid-Mounted ...

18036281668
 

Product Categories
Home > SupplyPro Co., Ltd. > Water Supply by Runping, Underground Integrated Tank and Pump System
Water Supply by Runping, Underground Integrated Tank and Pump System
品牌: Rui Ping Water Supply
Customized Processing: Supported
Liquid Transfer: Wastewater, rainwater, sewage
Effect: Landscaping | Eco-friendly
单价: 10000.00/Tai
最小起订Quantity: 1 Tai
供货总Quantity: 10000 Tai
有效期至: 长期有效
最后更新: 2023-03-27 16:26
 
详细Info

Detailed Description:

    Submersible pump integrated unit

Now, let me introduce to you the Runping underground trenching.Integrated pump boxDistinctive features from ordinary water tanks:

1. Standard water tanks are welded, while the integrated submersible pump water tanks are bolted together. There are a total of 3 types of integrated submersible pump water tanks.

Galvanized steel sheet, stamping formed, each stamping plate's stamping block is bolted together.

(2) SUS304 stainless steel material, shaped, the forming blocks of each stamping plate are connected with bolts.

(3) Composed of 3mm galvanized steel and 0.4mm stainless steel composite, these materials also vary significantly in price.

Submersible pump integrated water tankWith ordinaryStainless Steel Water TankConstruction plans vary as well; I'll introduce them to you below.B埋式泵Integrated Water Tank Construction Plan

To ensureSubmersible pump and container integrated systemThe water tank meets high design standards during production. Our company adheres to the corporate standards issued by the Jiangsu Provincial Bureau of Technical Supervision, with the serial number Q/320925YLP001-2013.

Tank specifications: 25m x 18m x 2.5m = 1125 m³

Sheet specifications: Top panel 2.0mm, Side panels 3.0mm/3.0mm/3.0mm, Bottom panel 3.0mm

Anti-float underground water tank construction procedure:

Bottom panel blanking → Bottom panel installation → Bottom panel connection → Bottom panel sealing inspection → Side panel blanking → Side panel connection → Side panel connection sealing inspection → Top panel blanking → Top panel connection → Top panel installation

1. According to the design requirements for the tank specifications and models, we use lubricated assembly tank module sheets within the factory. First, we mark the sheets, then send them to the cutting machine to be cut into 106×106cm blocks. After the sheets are cut, we trim the four corners to 90-degree angles, and then send them to the hydraulic press to mold them into 100×100cm and 50×50cm convex-concave panels, with all flanges being 90 degrees.

2. Upon arrival at the site, first assemble the molding plates, using bolt and seal technology for sealing connections. Connect the plates according to the tank's dimensions (length x width x height) with bolts, forming several panels of the tank or dividing them into several sections connected by bolts based on the tank's length and height. The top layer of the water tank is connected using bolts.

3. After assembling several panels, prepare for the bottom assembly connection. When bolting the bottom plate, the manufacturer of the buried box pump integration should first seal the bottom plate dimensions, arrange the bottom plate for sealing connection on the bottom plate, and then perform fire oil inspection and visual inspection on the sealed section to prevent loose seals and other phenomena.

4. After the base is connected, proceed with the wall panel and base connection. Bolt connection involves first placing the code on one side of the base of the water tank. After placing the codes on all four sides, adjust the flanges for connection. The relative angle of the dimensions should generally be below 2mm, with a requirement for straight lines. The corners must have a 90-degree connection between the bottom and the wall.

5. After the bottom of the water tank is sealed to the wall with bolts and gaskets, it is then connected to the top and wall, with the edges aligning to form a basically straight horizontal line. According to customer specifications, the manhole of the water tank is connected at the designated location, typically installed near the float ball of the inlet hole.

6. After the water tank connections are sealed, proceed to open the inlet, outlet, overflow, discharge, fire hydrant, and install the ladder near the manhole.




询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

18036281668