RuiPing Water Supply, Underground Integrated Tank and Pump System_SupplyPro Co., Ltd._Yancheng Runping Water Supply Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Yancheng Runping Water Supply Equipment Co., Ltd

Integrated Pre-Made Pump Station, Wastewater Lift Pump Station, Skid-Mounted ...

18036281668
 

Product Categories
Home > SupplyPro Co., Ltd. > RuiPing Water Supply, Underground Integrated Tank and Pump System
RuiPing Water Supply, Underground Integrated Tank and Pump System
品牌: Rongping Water Supply
Custom Processing: Support
Liquid Transfer: Wastewater, Rainwater, Effluent
Effect: Landscaping & Environmental Protection
单价: 10000.00/Tai
最小起订Quantity: 1 Tai
供货总Quantity: 10000 Tai
有效期至: 长期有效
最后更新: 2023-03-27 15:55
 
详细Info

Detailed Description:

    Submersible pump and tank integrated unit

Now, let me tell you about Runping's buried cable.Integrated pump in boxDifferences from standard water tanks:

1. Standard water tanks are welded, while the integrated buried water tank pumps are bolted together. There are a total of 3 types of integrated water tanks for buried water tank pumps:

Galvanized steel sheet, molded into shape, with each stamping panel's mold piece bolted together.

(2) SUS304 stainless steel material, formed, the forming blocks of each stamping plate are connected by bolts.

(3) Composed of 3mm galvanized steel plate and 0.4mm stainless steel composite, these materials vary significantly in price.

Submersible pump integrated water tankWith the ordinaryStainless Steel Water TankConstruction plans vary as well; I will introduce them to you below.Submersible pumpConstruction Plan for Integrated Water Tank

To ensureSubmersible pump packageThe water tank meets high design standards during production. Our company operates in accordance with the enterprise standards issued by the Jiangsu Provincial Bureau of Technical Supervision, with the code Q/320925YLP001-2013.

Tank specification: 25m x 18m x 2.5m = 1125m³

Sheet specifications: Top panel 2.0mm, Side panels 3.0mm/3.0mm/3.0mm, Bottom panel 3.0mm

Anti-float buried water tank construction procedure:

Bottom panel cutting → Bottom panel installation → Bottom panel connection → Bottom panel sealing inspection → Side panel cutting → Side panel connection → Side panel connection sealing inspection → Top panel cutting → Top panel connection → Top panel installation

1. According to the design requirements for the tank specifications and models, we use lubricated assembly-type tank module sheets within the factory. First, we mark the sheets, then send them to the cutting machine to be cut into 106×106cm blocks. After cutting, we trim the four corners to 90-degree angles, and then send them to the hydraulic press to mold them into 100×100cm and 50×50cm embossed and debossed panels, with all flanges being 90 degrees.

2. Upon arrival at the site, first assemble the formed panels, using bolt and seal technology for sealed connections. Connect the bolts according to the tank's dimensions (length x width x height) to form the tank's several panels, or divide the tank into several sections based on its length and height for bolted connections. The top layer of the water tank is connected using bolts.

3. After assembling several panels, prepare for the bottom assembly connection. When bolting the bottom panel, the manufacturer of the buried box pump integrated unit should first seal the bottom panel's dimensions, arrange the bottom plate for sealing connection on the bottom panel. After the bottom plate connection, perform fire oil inspection and visual inspection on the sealing section to prevent loose seals and other issues.

4. After the base panel is connected, proceed with the connection of the wall panel to the base. First, place the code on one side of the base panel of the water tank using bolts. After placing the codes on all four sides, adjust the flanges for connection. The general relative angle of the dimensions should be below 2mm, ensuring straightness, with the corners requiring a 90-degree connection between the base and the wall.

5. After the bottom of the water tank is sealed to the wall with bolts and gaskets, it is then connected to the top and the wall, with the edges requiring a basically straight horizontal line. According to customer requirements, the manhole of the water tank is connected at the specified location, usually installed near the float ball of the inlet hole.

6. After the water tank is sealed, proceed to open the inlet, outlet, overflow, drain, fire hydrant, and install the ladder near the manhole.




询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

18036281668