Integrated Pump Station EnhancementPrimarily used for river interception and rural wastewater collection and transportation. The standardized vertical sewage pump station is equipped with an internal maintenance platform and an overhead control cabinet. It is pre-installed and tested at the factory, ensuring quick on-site setup. The system is reliable, with the control cabinet placed on the roof, on the ground, or within the equipment room. It can be used for outdoor installation as well as for the creation of a maintenance area, allowing for the installation of lifting equipment for the protection of pumps and格栅 equipment. The integrated prefabricated pump station enhances unattended protection, long-distance monitoring, saving maintenance costs, and boasts high performance; the internal layout of the pump station is specially designed for high-configuration intelligent operation.

The specific construction methods and process of the integrated pumping station: Investigate the site conditions and formulate a plan. For the equipment of the integrated prefabricated pumping station, the structure of the site is crucial. It is necessary to survey the site and formulate an excavation plan in front of the equipment, and closely monitor the safety of the foundation pit during excavation. When excavating the pump pit, consider the stability of the slope and potential drainage methods, which should be suitable for the current soil environment. At the edge of the pit bottom, a small sedimentation pond can be constructed for continuous drainage, ensuring that there is no water accumulation on the flat surface of the pit bottom. The bottom of the well should be properly foundationed to ensure the normal operation of the integrated prefabricated pumping station. During installation, the bottom of the well must be properly foundationed, leveled, filled with sand, and compacted. If necessary, a layer of gravel-free material can be laid, compacted with a compactor, and the degree of compaction should reach90%The compaction test results indicate that special caution is necessary when performing compaction operations on sensitive foundations. Properly set up the equipment well, clean the surface of the concrete base with a brush, ensuring no dirt or debris is between the equipment face and the pump equipment flange. Lift the pump body using a crane hook and place it in the center of the foot bolt ring on the concrete base.
Integrated Pump Station EnhancementBefore connecting the pipeline interfaces, backfill around the pump station well with cobblestone or sand up to the lower surface of the connecting pipe, and compact it. Check the equipment at the inlet end: the pipe and seals must be clean, the inlet pipe aligned with the connection, and the connecting bolts securely tightened. Ensure the flange joints are sealed tightly, aligned with the pipe, and uniformly tightened symmetrically.