Floor deck_SupplyPro Co., Ltd._Beijing Baosin Shidat Environmental Protection Materials Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Beijing Baosin Shidat Environmental Protection M

A comprehensive large-scale manufacturer of innovative building panels, integ...

15210409621
 

Product Categories
Home > SupplyPro Co., Ltd. > Floor deck
Floor deck
品牌: Baosin Worldstar
Model: Place an order
Specs: Inquire
Quantity: Place an order
单价: 电议
最小起订Quantity:
供货总Quantity:
有效期至: 长期有效
最后更新: 2023-06-16 10:29
 
详细Info

Roof Decking Product Introduction

Baoxin Composite Decking serves as a formwork during construction, bearing both construction loads and the weight of concrete. In use, it acts as the reinforcing mesh on the bottom surface. After the concrete reaches its strength, a combined effect is produced.

Baosin - Closed Combination Deck Features:

Robust concrete shear bonding: The special closed rib design offers excellent longitudinal shear performance. Under its allowable design load, the closed deck slab has never shown any slippage between the steel deck and concrete.

· Fire Resistance: The ribbed boards are fully encapsulated within the concrete, similar to the reinforcing steel in cast-in-place concrete slabs. Closed ribbed floor decks can completely replace the tensile steel of the positive bending moment in floor slabs, achieving a fire resistance of 1.5 hours without the need for fire-resistant coatings.

· Composite floor section: Closed composite floors offer a greater effective height of the floor, providing higher resistance to positive bending moments during the usage stage.

· Ceiling and suspended ceiling track system: Suitable for installation of ceilings, suspended ceilings, plumbing and electrical pipes, etc., without the need for drilling or welding. It can be moved, removed, or reinstalled as needed during the building's use.

· Easy and quick installation: No need for any end caps, no leakage of slurry, and can shorten the construction period.

Flat deck bottom appearance: The floor bottom is smooth, offering a more aesthetically pleasing look for buildings where ceiling installation is not desired.

· Can effectively reduce floor height: The total thickness of closed ceiling floor decks only 110-130mm according to fire prevention regulations and vibration resistance, reducing weight, lowering costs, and increasing net height

Low cost: The reinforcing steel at the bottom of the closed-section deck plate, which withstands positive bending moments, is replaced by closed-section corrugated steel plate, eliminating the need for fire-retardant paint, reducing steel consumption, and lowering costs.

Baosin Color Steel - Offering over a dozen roof deck panel models for your selection! There's always a size that fits your needs!

 

  




Baosin - Closed Combination Deck Hangers

Bore Size: Available in three options for M6, M9, and M12 bolts or screws.

Cautionary Notes:

Once the concrete above the closed deck has been poured and the concrete has reached 75% of its design strength, the slot-type suspension system is permitted for installation and can then be utilized for hanging. Ceiling suspension systems, electrical and water supply lines, air conditioning ducts, and equipment hanging facilities are available.

  

 

Advantages:

Easy to disassemble and install, no special tools required.

Reusable with almost zero waste.

Offer heavy-duty suspension services with high density and strength.

No noise will be produced during construction.

Baosin - Composite Floor Installation Instructions

Construction Steps

One,尺寸复检与弹线

Axis Size: Verify that the axis size of the steel beam installation matches the layout drawing of the corrugated steel plate.

2. Beam Top Surface Treatment: Ensure that all lifting rings on the steel beam top are cut off and smoothed, and the rust, oil stains, and debris on the beam top surface should be thoroughly cleaned.

3. Alignment Lines: Based on the roof deck layout, mark the rib top surface with the patterned steel plate starting line and middle control line. The starting line should indicate the laying direction and the hoisting and binding number of the steel plate, and the middle control line can also serve as the starting line for section-by-section laying.

Two: Hoisting and Laying

1. Baosin steel deck should be installed according to the approved layout plan. When bundled steel plates are stacked on the structure, attention should be given to the design support strength of the structural members to avoid exceeding their allowable load.

2. Baosin - Steel deck panels should be bundled and stacked, spanning across multiple steel beams. When placed between two beams individually, attention should be given to the width of the ends' supports to prevent tipping and potential accidents.

3. After the Baosin roof deck is hoisted into place, start from the extended starting line of the steel beam, align each panel sequentially in the laying direction, and adjust the board joints appropriately after reaching the control line.

4. Construction should be halted during strong winds. Unwrapped corrugated steel sheets should be re-tied immediately; otherwise, they may be blown away by the wind, leading to safety accidents or damage to the sheets.

III. Fixed


1. Baosin Corrugated Steel Sheets should be immediately secured to the structural members using electric welding after positioning.

2. Any corrugated steel sheet that has been laid but not securely fastened may be blown away or slipped off, potentially causing an accident.

 


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

15210409621