Decking plate_SupplyPro Co., Ltd._Beijing Baosin Shidat Environmental Protection Materials Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Beijing Baosin Shidat Environmental Protection M

A comprehensive large-scale manufacturer of innovative building panels, integ...

15210409621
 

Product Categories
Home > SupplyPro Co., Ltd. > Decking plate
Decking plate
品牌: Baosin Worldstar
Model: Place an order
Specs: Inquire
Quantity: Place an order
单价: 电议
最小起订Quantity:
供货总Quantity:
有效期至: 长期有效
最后更新: 2023-06-16 10:29
 
详细Info

Floor Decking Product Introduction

Baoxin floor deck serves as a formwork during construction, bearing construction loads and the weight of concrete. In use, it acts as the bottom reinforcement. After the concrete reaches its strength, a composite effect is produced.

Baosin - Closed Combination Deck Features:

Robust concrete shear bond: The special closed rib design ensures excellent longitudinal shear performance. Under its allowable design load, the closed deck slab has never shown any slip between the steel deck and concrete.

· Fire-resistant performance: The ribbed panels are fully encapsulated within the concrete, akin to the rebar within cast-in-place concrete slabs. Closed rib floor decks can completely replace the tensile reinforcement for the positive bending moment in floor slabs, achieving a fire resistance of 1.5 hours without the need for fire-resistant coating.

· Composite floor section: Closed composite floors offer a greater effective height of the floor, providing enhanced resistance to positive bending moments during the usage stage.

· Ceiling and suspended ceiling hanging system: Suitable for installation of ceiling, suspended ceiling, electrical and water pipes, etc., without the need for drilling or welding. During the building's use, it can be moved, removed, or reinstalled as needed.

Easy and quick installation: No end caps required, no leakage, and can shorten the construction period.

Flat bottom board appearance: The floor bottom is smooth, providing an aesthetically pleasing look for buildings that do not require suspended ceilings.

· Effectively reduces floor height: With fireproof and vibration-damping specifications, the total thickness of the closed floor deck is only 110-130mm, reducing weight, lowering costs, and increasing net height

Low cost: The bottom steel bars that bear the positive bending moment in closed-web deck are replaced with closed-web profiled steel plates, eliminating the need for fire-retardant paint, reducing steel consumption, and lowering costs.

Baosin Color Steel - Offering over a dozen roof deck plate models for your selection! There's sure to be a size that fits your needs!

 

  




Baosin - Closed Combination Deck Hangers

Bore Size: Available in three options for M6, M9, and M12 screws or bolts.

Cautionary Notes:

Once the concrete above the closed formwork deck has been poured and the concrete reaches 75% of its designed strength, the slot-type suspended system may be installed and utilized for its hanging function. We offer hanging facilities for ceiling tiles, electrical and water supply lines, air conditioning ducts, and equipment.

  

 

Advantages:

Easy to disassemble and install, no special tools required.

Reusable with almost zero waste.

Offer heavy-duty suspension services with high density and strength

No noise will be generated during construction.

Baoxin - Composite Floor Installation Instructions

Construction Steps

One, Dimension Re-inspection and Tension Line

1. Axial Size: Recheck the axial size of the steel beam installation to ensure it matches the layout drawing of the corrugated steel sheet.

2. Beam Top Surface Treatment: Ensure that all lifting rings on the steel beam top have been cut off and smoothed, and that the rust, oil stains, and debris on the beam top surface should be cleaned thoroughly.

3. Location Lines: From the deck plate layout, locate the starting line and middle control line on the beam top surface for the corrugated steel sheet. The starting line should indicate the laying direction and the hoisting捆number of the steel sheet, and the middle control line can also serve as the starting line for segmented laying.

Two: Hoisting and Laying

1. Baosin-Deformed Steel Deck should be installed according to the approved layout drawing. When bundled corrugated steel sheets are stacked on the structure, attention should be given to the design support strength of the structural members to avoid exceeding their allowable load.

2. Baosin - Steel deck sheets should be bundled and stacked, spanning over multiple steel beams. When a single span is placed between two beams, attention should be given to the width of the support at both ends to prevent tipping and potential falling accidents.

3. After the Baosin roof deck is hoisted and positioned, start laying from the extended starting line of the steel beam, sequentially position each panel along the laying direction, and after reaching the control line, adjust the panel seams appropriately.

4. Construction should be halted during strong winds. Any unpacked corrugated steel sheets should be re-tied immediately; otherwise, the sheets may be blown away by strong winds, resulting in safety accidents or damage to the sheets.

III. Fixed


1. Baosin-pressed steel sheets should be immediately fixed to the structural members using electric welding after positioning.

2. Any laid but unfixed corrugated steel sheet may be blown away or slipped off by strong wind, causing accidents.

 