1. The product features both front and back sides. When covering the greenhouse, the raw edge should face out (with the coating side down). Try to cover the film in advance before planting the seedlings, thoroughly water the soil, close the ventilation holes, and seal the greenhouse for 2-5 days to aid in dripping.
2. The coating is susceptible to damage from external forces. Both before and after the construction of the shed, appropriate protective measures should be taken to prevent excessive contact and friction with the frame or wires of the greenhouse, to avoid damaging the coating and affecting the demisting and droplet retention performance.




