Grouting reinforcement for foundation, Grouting reinforcement for house foundation, Grouting reinforcement for road settlement_SupplyPro Co., Ltd._Beijing Zhuangzhi Construction Development Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Beijing Zhuangzhi Construction Development Co., Ltd.

Foundation Grouting Reinforcement, House Foundation Grouting Reinforcement, R...

Soule Star Diamond Member
Consultation Hotline
13611007200

News Center Co., Ltd.
  • No News

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Grouting reinforcement for foundation, Grouting reinforcement for house foundation, Grouting reinforcement for road settlement
Grouting reinforcement for foundation, Grouting reinforcement for house foundation, Grouting reinforcement for road settlement
品牌: Vigorous Construction
Structure: Structural Reinforcement Design
Customized Processing: Is
Appearance: Smooth
单价: 120.00/square meters
最小起订Quantity: 1 square meters
供货总Quantity: 9999 square meters
有效期至: 长期有效
最后更新: 2023-04-27 15:12
 
详细Info

Grouting reinforcement is suitable for地基加固, including sandy soil, silt soil, clay soil, and artificial fill soil.

Before grouting reinforcement design, it is advisable to conduct indoor slurry mixing tests and on-site grouting tests to determine design parameters and inspect construction methods and equipment; if regional experience is available, design parameters can be determined according to regional experience.

Grouting reinforcement design shall comply with the following provisions:

1. For ground reinforcement with slurry grouting, a suspension liquid with cement as the main agent or a two-liquid mixture of cement and water glass can be chosen. For anti-seepage and leak plugging grouting, water glass, a mixture of water glass and cement, or chemical slurry can be used, but chemical slurries harmful to the environment should be avoided. For reinforcing soil layers with groundwater flow, single-liquid cement slurry should not be used; instead, two-liquid grouting or a fast-setting alternative with a short initial setting time is recommended. Compaction grouting can use low slump cement mortar and drainage channels should be set up.

2 The spacing of grouting holes should be determined based on on-site tests, preferably 1.2m to 2.0m; grouting holes can be arranged on the inner or outer side of the foundation, or within the foundation. After grouting within the foundation, measures should be taken to seal the holes in the foundation.

3 The initial setting time of the slurry should be determined based on the soil conditions of the foundation and the purpose of grouting. For sandy soil foundations, it is recommended to be 5-20 minutes, and for clayey soil foundations, 1-2 hours.

4 The preliminary design of the injection volume and effective range of injection can be determined by empirical formulas.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13611007200