Caisson Compaction Grouting Reinforcement, Professional Grouting Sealing, Foundation Grouting Reinforcement_SupplyPro Co., Ltd._Beijing Zhuangzhi Construction Development Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Beijing Zhuangzhi Construction Development Co., Ltd.

Foundation Grouting Reinforcement, House Foundation Grouting Reinforcement, R...

Soule Star Diamond Member
Consultation Hotline
13611007200

News Center Co., Ltd.
  • No News

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Caisson Compaction Grouting Reinforcement, Professional Grouting Sealing, Foundation Grouting Reinforcement
Caisson Compaction Grouting Reinforcement, Professional Grouting Sealing, Foundation Grouting Reinforcement
品牌: Vigorous Construction
Process and customize: Is
Water addition amount: 10-13%
Materials: Reinforced concrete, steel plates, carbon fiber, etc.
单价: 120.00/square meters
最小起订Quantity: 1 square meters
供货总Quantity: 9999 square meters
有效期至: 长期有效
最后更新: 2023-04-27 15:13
 
详细Info

Grouting reinforcement is suitable for foundation reinforcement in sandy soil, silt soil, clay soil, and artificial fill soil.

Prior to grouting reinforcement design, it is advisable to conduct indoor slurry ratio tests and on-site grouting tests to determine design parameters and inspect construction methods and equipment; when regional experience is available, design parameters can be determined based on such experience.

Design for grouting reinforcement shall comply with the following provisions:

1. For soil reinforcement with grouting slurry, a suspension liquid with cement as the main agent or a two-liquid mixture of cement and water glass can be chosen. For anti-seepage and leak plugging grouting, water glass, a mixture of water glass and cement, or chemical slurry can be used, but chemical slurries that pollute the environment should be avoided. For reinforcing soil layers with groundwater flow, single-liquid cement slurry is not recommended; instead, use two-liquid grouting or a fast-setting alternative with a short initial setting time. Compaction grouting can utilize low-slump cement mortar and should be equipped with drainage channels.

The spacing of grouting holes should be determined based on on-site tests, ideally between 1.2m to 2.0m; grouting holes can be arranged on the inner or outer side of the foundation, or within the foundation. After grouting within the foundation, measures should be taken to seal the holes.

3 The initial setting time of the slurry should be determined based on the soil condition of the foundation and the purpose of grouting. For sandy soil foundations, it is recommended to be between 5 minutes to 20 minutes, and for clayey soil foundations, between 1 hour to 2 hours.

4 The initial design of the injection volume and effective range can be determined based on empirical formulas.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13611007200