Aluminum alloy bridge架_SupplyPro Co., Ltd._Zhongcheng Power Equipment (Shandong) Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Zhongcheng Power Equipment (Shandong) Co., Ltd.

Primary products include: galvanized bridge channels, ste...

Consultation Hotline
15863561177

News Center Co., Ltd.
  • No News

Product Categories
Home > SupplyPro Co., Ltd. > Aluminum alloy bridge架
Aluminum alloy bridge架
品牌: Zhong Cheng Power
Aluminum alloy cable tray: 100m
Aluminum alloy bridge tray manufacturer: 200 meters
Aluminum Alloy Bridge Support Manufacturer: 100m
单价: 16.80/Rice
最小起订Quantity: 1 Rice
供货总Quantity: 100000 Rice
有效期至: 长期有效
最后更新: 2022-06-02 11:55
 
详细Info

Aluminum alloy bridgeways must consider the cable routing and detail handling during installation. Moreover, there are various types of bridgeways available for cable installation, each with its unique installation characteristics.

The ground jumper wires can be installed at random on both sides of the bridge or through a gap connection, but not on the prominent side. The wire ferrules and claw-shaped washers are assembled in reverse order for the ground jumper wires, some do not have claw-shaped washers, and the galvanized bridge ground bolts lack anti-loosening washers.

2. Cable tray and bracket not securely fastened; bridge support not properly grounded; no firestop installed for the pass through fire partition.

  3.Aluminum alloy bridge beamThe insulation against electrochemical corrosion between the steel brackets has not been treated. The bends, tees, etc., of the bridge are not using the ready-made accessories that come with the bridge, but are made on-site. The processing quality does not meet the standard requirements.

4. During the installation of the screw rod bracket, anti-vibration supports were not set as per specifications, and the steel bracket was not constructed in accordance with anti-corrosion requirements.

5. Metal cable trays and their supports are not properly grounded throughout their entire length, and expansion joints are not installed as per specifications.

6. Ceiling tray, channel bridge cover plate missing. The nuts of the fixing bolts for the bridge plate connections are installed on the inside of the bridge, and there is no grounding connection made between the bridge, the distribution box/cabinet, and the steel pipes connected or connected to them.


询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15863561177