What improvements can be achieved by using the deep compaction foundation method in civil engineering construction?_News Center Co., Ltd._Chongqing Pile Compaction Foundation Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Chongqing Pile Compaction Foundation Engineering

House construction, building decoration, foundation and substructure engineer...

17079580271
18008319598
 

News Category
  • No Category

Contact Information
  • Contact person:王经理
  • Telephone:18008319598
  • Mobile:17079580271
  • Address:2 Dongsheng Road, Liangzhu Town, Changzhou City, Jiangsu Province
Home > News Center Co., Ltd. > What improvements can be achieved by using the deep compaction foundation method in civil engineering construction?
News Center Co., Ltd.
What improvements can be achieved by using the deep compaction foundation method in civil engineering construction?
Publish Time:2023-07-04        View Count:66         Return to List

  Reinforcement Construction TeamFoundation work is the backbone of construction projects, crucial to the entire project's vitality and the quality of completion. There are many different skill plans for foundation treatment, and among them, the technique of dynamic compaction is undoubtedly very suitable. The purpose of dynamic compaction for foundation is to compact the foundation through the external impact force, thereby enhancing its density and corresponding bearing capacity. So, what aspects can the construction method of dynamic compaction foundation improve in civil engineering projects?
Construction sites for civil engineering projects generally have different soil types, and each soil type requires a different treatment method. Isn't this undoubtedly adding to the challenges for construction workers? If the skill plan for dynamic compaction foundation treatment is adopted, however, it allows for a more agile handling of these difficulties. The dynamic compaction foundation treatment includes dynamic compaction and dynamic compaction replacement methods, both of which are monitored by specialized personnel during construction. For instance, before dynamic compaction, the quality of the compaction hammer and the drop distance are checked; during the process, the number of blows, the amount of compaction, and the replacement depth are monitored, with all parameters and construction conditions recorded. Each blow is rechecked for the compaction point layout, and the position of the compaction pit is verified after compaction.
    
Deep Compaction FoundationPrior to construction, it is necessary to improve the soil's compaction characteristics. If significant settlement is observed in the building, the compaction modulus must be enhanced to ensure the safety of the dynamic compaction process. To prevent the occurrence of uplifting at the bottom of the pit, the bearing capacity of the foundation must not be overly weak, and the shear strength of the soil layer must be strengthened. The use of dynamic compaction for foundation treatment can effectively improve these properties. Additionally, this method can effectively prevent water infiltration during excavation and can eliminate or reduce the collapsibility of loess, as well as the swelling properties of expansive soils.


 Click submit means you agree to《Service terms》《Privacy policy》

17079580271