Commercial Renovation Demolition, Hotel & Hotel拆除, Shopping Mall Demolition, Industrial Construction Demolition, Experienced in Construction_SupplyPro Co., Ltd._Beijing Zhongguang Shengda Engineering Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Beijing Zhongguang Shengda Engineering Technology Co., Ltd.

Rope Saw Cutting, Concrete Cutting, Floor Cutting and Demolition, Engineering...

Consultation Hotline
15201060490

News Center Co., Ltd.
  • No News

Product Categories

Contact Information
  • Contact person:刘经理
  • Telephone:15201060490
  • Mobile:15201060490
Home > SupplyPro Co., Ltd. > Commercial Renovation Demolition, Hotel & Hotel拆除, Shopping Mall Demolition, Industrial Construction Demolition, Experienced in Construction
Commercial Renovation Demolition, Hotel & Hotel拆除, Shopping Mall Demolition, Industrial Construction Demolition, Experienced in Construction
品牌: Zhongguang Shengda
Construction Method: Cutting, Drilling, Demolition
Quotation Method: Call for Quotation
Construction Period: Combine site assessment
单价: 160.00/square meters
最小起订Quantity: 1 square meters
供货总Quantity: 1000 square meters
有效期至: 长期有效
最后更新: 2024-02-21 15:20
 
详细Info

During the demolition construction process at the shopping mall, the work should be carried out in sections and not vertically intersect. Holes on the work surface should be sealed. When demolishing buildings, attention must be given to the strict prohibition of large crowds gathering or materials being stacked on the floor slabs; when removing beams, ensure effective control of their descent before cutting the steel bars at both ends and slowly lowering them one end at a time; when removing columns, chip out the steel bars at the bottom of the column, use a manual winch to pull in the direction, and use gas welding to cut the steel bars on three sides of the column, retaining the steel bars on the front of the pull direction; when removing pipelines and containers, it is necessary to identify the type and chemical properties of the remaining substances, take appropriate measures before proceeding with the demolition work.

Demolition and Removal of Shopping Mall Reconstruction: The floor slabs are reinforced concrete. First, use a cutting machine to create an 800x800mm hole in the middle of the slab to be removed, then transport it to the ground floor outdoor area and break it apart. Demolition of Remaining Floor Slabs: Crush the remaining slabs to be removed with a hydraulic clamp, clean up the slabs to be removed; inspect if the removed concrete blocks pose any harm to other structures or individuals; when the hydraulic clamp cannot be used at 200mm from the frame column, manually chip away the remaining part, cut and remove the concrete blocks, and transport them to the client's external transportation site.


询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15201060490