Road Cutting, Highway Pavement Cutting, Pavement Demolition Cutting, Non-Destructive Static Cutting_SupplyPro Co., Ltd._Beijing Zhongguang Shengda Engineering Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Beijing Zhongguang Shengda Engineering Technology Co., Ltd.

Rope Saw Cutting, Concrete Cutting, Floor Cutting and Demolition, Engineering...

Consultation Hotline
15201060490

News Center Co., Ltd.
  • No News

Product Categories

Contact Information
  • Contact person:刘经理
  • Telephone:15201060490
  • Mobile:15201060490
Home > SupplyPro Co., Ltd. > Road Cutting, Highway Pavement Cutting, Pavement Demolition Cutting, Non-Destructive Static Cutting
Road Cutting, Highway Pavement Cutting, Pavement Demolition Cutting, Non-Destructive Static Cutting
品牌: Zhongguang Shengda
Quotation Method: Call for Quotation
Construction Duration: Combine site assessment
Number of construction personnel: Based on the engineering volume
单价: 99.00/square meters
最小起订Quantity: 1 square meters
供货总Quantity: 1000 square meters
有效期至: 长期有效
最后更新: 2024-03-09 14:35
 
详细Info

Cutting concrete construction requirements include: 1. Determine the locations for concrete cutting and removal. The removal areas must be cross-checked against the drawings repeatedly and only proceed upon confirmation. According to the actual conditions of the construction site, remove the floor slabs first, then the beams, starting with the connecting beams and then the main beams. Reliable product protection measures should be in place around the removal areas, and stringent isolation measures should be taken for fragile and easily damaged items. Install support frames: The support frames must be sturdy and reliable, and the load-bearing capacity must meet the requirements. The support frames for concrete cutting and installation must be tightly adhered to the bottom of the beams to be removed. 2. Partial cutting and removal: The order of concrete cutting is to remove walls and floor slabs first, followed by beams. The connection between the structure to be removed and the original structure must not use pneumatic demolition to avoid affecting the quality of the original structure.

Concrete Cutting and Demolition: Although the application of concrete cutting technology is widespread, in reality, there are very few contractors who truly master the key points of demolition. In fact, by mastering just 6 key techniques, one can achieve the effect of moving a thousand pounds with just a few pounds of force during the demolition of buildings. Key Points for Concrete Cutting and Demolition: If the following situations are found during the demolition process, the construction unit should immediately notify the designer, and only after the designer confirms can the work continue: 1. Deformation of the existing structure; 2. Rusting of the existing structural steel; 3. Cracks in the existing structure.