Spiral Coiled Sheet Storage Warehouse_SupplyPro Co., Ltd._Shandong Liaocheng Zhengyang Steel Grain Silo Construction Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shandong Liaocheng Zhengyang Steel Grain Silo Construction Co., Ltd.

Steel silos, steel storage buildings, aggregate silos, large-scale steel silo...

Consultation Hotline
15506351199

Product Categories
Home > SupplyPro Co., Ltd. > Spiral Coiled Sheet Storage Warehouse
Spiral Coiled Sheet Storage Warehouse
品牌: Liaocheng Zhengyang Steel Grain Silos
Hebei Steel Plate Silo Co., Ltd.: 10T
Jiangsu Large Steel Plate Silo: 20T
Henan Cement Steel Plate Silo Manufacturer: 40T
单价: 2680.00/ton
最小起订Quantity: 1 ton
供货总Quantity: 10000 ton
有效期至: 长期有效
最后更新: 2023-02-14 13:39
 
详细Info

Routine maintenance and care for the Zhengyang steel silos involve on-site inspections, measurements, and meticulous calculations for all projects constructed. Design is guided by specific data and related theories, ensuring scientific construction in aspects such as foundations, steel structures, and gas homogenization discharge systems, thereby leading the steel silos to a path of standardization.


Monthly inspections of the storage tank's top hoop, process holes, and other bolted connections are required to ensure they are intact, and to check for loose bolts and damaged washers. Examine the surface for rust and seal integrity, and address any issues promptly for maintenance.


Due to the alternating load conditions of steel plate silos, the welds on the silo body should be inspected every six months. Deformed weld areas should be corrected and re-welded, and corrosion areas should be treated with anti-corrosion measures promptly.


Regularly inspect the steel silo wall for local deformation. After unloading and emptying the silo, frequently check the sealing integrity of the steel cylinder silo, the door frame and adjacent side panels, and whether the reinforcing bars have deformed or if there are cracks or other issues. Perform maintenance, repairs, and upkeep based on the actual conditions. After unloading and emptying the silo, regularly inspect the cone hopper's connection points, welds, and the surface of the cone hopper plates. If welding deformation or cracking occurs, stop feeding to avoid accidents.




During the installation of the Zhengyang steel silo, the body must not be allowed to tilt as tilting can cause uneven distribution of forces on the legs during use, leading to further tilting and, in severe cases, collapse, affecting future use. During the operation of the Zhengyang steel silo, precautions against adverse weather conditions should be taken, such as installing lightning rods on the silo roof. It is necessary to regularly clean the dust collector bags on the top of the steel silo to remove materials like cement, ensuring timely cleaning to extend the lifespan of the dust bags and reduce dust pollution to a minimum.


询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15506351199