Key Points and Methods for Installing烧结Brick Tiles
1. During transportation and handling, vitrified bricks must be strictly prohibited from being overturned or thrown. They should be neatly stacked and categorized, with a height not exceeding 2 meters.
2. Wall tie reinforcement, seismic structural column reinforcement, large formwork concrete slab reinforcement, and various embedded parts, as well as heating, ventilation, and electrical pipelines, should all be protected and not be arbitrarily altered or damaged.
3. Mortar consistency should be appropriate, and prevent mortar from splashing and soiling the wall during bricklaying.
4. During the installation of scaffolding on the hoisting platform or the setup of large formwork, the foreman and crane operator must give careful instructions and operate meticulously to prevent collisions with the newly constructed brick walls.
5. Around the well rig feed opening, cover with plastic film or wooden boards to maintain wall cleanliness.