Home > News Center Co., Ltd. > Glass Sensing Door Installation Process
News Center Co., Ltd.
Glass Sensing Door Installation Process
Publish Time:2024-06-01        View Count:44        Return to List

The installation steps for glass sensor doors are as follows:


Preparation Phase:

Determine the installation location and dimensions for the sensor door, and clear the installation area.

Prepare the necessary tools, such as a drill, screwdriver, level, and inductive door components.


Install Door Header

Secure the door header above the door opening to ensure it is level and sturdy.


Track Installation:

Install upper and lower tracks according to the type of door, ensuring the tracks are flat and parallel.


Install Door Panels

Install the door leaf onto the track, adjusting the position and gap of the door leaf.


Connective Electrical Components:

Ensure correct connection of electrical components such as sensors and motors according to the instructions.


Tuning the Inductive System:

Adjusted parameters such as detection range and sensitivity to ensure the normal operation of the sensor door.


Test Run

Multiple tests were conducted on the door's opening and closing action to ensure smooth operation and detect any anomalies.


Final Touches:

Clean up the construction site and sanitize the sensor doors.


When installing glass sensor doors, the following points should be noted:

Ensure the installation foundation is sturdy enough to bear the weight of the door and the force during operation.

Ensure electrical connections are correct and safe to prevent malfunctions or safety hazards.

- Operate strictly according to the manufacturer's installation guide.

The debugging process must be meticulous to achieve better usability.


For installing door headers, use a level to carefully calibrate and ensure they are level; when mounting tracks, take precise measurements to guarantee accurate installation positions; during the tuning of the induction system, set it according to the actual usage scenario for both convenience and safety.