Here are the correct operation steps for a stabilized soil mixing station:
Ensure timely verification of all indicators at the mixing station for accuracy, and regularly check the clutch, brake, and lifters for smooth and reliable operation, as well as the track condition and any damage or断裂 in the steel cables. Only after a trial run of all machinery reaches normal standards can operations proceed.
2. Inspected the internal and external wiring of the mixing building to ensure all lines are well-insulated. Protective devices should be installed on the exposed rotating parts of machinery and equipment.
3. Strictly prohibit placing large stone materials and other iron products into the storage bin, and ensure the integrity and normal operation of the conveyor belt. No persons are allowed to stand near the hoist bucket and conveyor belt.
4. Operating areas and observation points of the mixing tower must be equipped with work platforms and guardrails. It is strictly prohibited to carry out maintenance during the operation of the mixing tower.
5. No one is permitted to enter the mixing storage area, and it is strictly forbidden to casually throw debris into the mixing storage. A thorough inspection of the storage area must be conducted before each operation, ensuring that the stairs to the upper and lower mixing storage areas are safe and reliable.