Geotextile Membrane Construction Process_News Center Co., Ltd._Geotextile Membrane Construction Process,Dezhou YuRun Geotechnical Materials Co., Ltd._Dezhou YuRun Geotechnical Materials Co., Ltd._Zhongshang 114 Industry Resources Network
Dezhou YuRun Geotechnical Materials Co., Ltd.

Our business scope includes the manufacturing, sales, construction, and export of products such as needle-punched carpet, geosynthetic materials, composite geosynthetic materials, waterproof membranes, bentonite waterproof geotextiles, drainage boards, drainage grids, grass grid, polyester fiber, carpet backing adhesive, geotextile adhesive, geogrid, geocell, film (FE film), weed control fabric, plastic woven fabric, and more. Our product line includes polyester long fiber geotextile, polyester short fiber nonwoven geotextile, HDPE geomembrane, waterproofing membrane, tunnel waterproof board, composite geomembrane, waterproofing geotextile, PP/PE woven fabric, weed control fabric, PE/EVA/ECB waterproof board, GCL sodium bentonite waterproof geotextile, three-dimensional composite drainage grid, ecological bags, planting bags, (accumulative) drainage boards, geogrid, three-dimensional soil stabilization mat, geocell, geonet, and construction materials.

Consultation Hotline
13181363048  13181363048
 

Company Information

Location:Shandong/Dezhou

会员级别:采商通4

身份认证:   

我的勋章:  通过中商114认证 [诚信档案]

Business Card

  • 公司名称Dezhou YuRun Geotechnical Materials Co., Ltd.
  • 联 系 人张之铎 (先生)
  • 公司电话13181363048
  • 手机号码13181363048
  • Company AddressDezhou Lingcheng Economic and Technological Development Zone, West of Wu You Street, Middle Section
home > News Center Co., Ltd. > Geotextile Membrane Construction Process
News Center Co., Ltd.
Geotextile Membrane Construction Process
Publish Time:2022-11-18        View Count:6        Return to List

Geotextile membrane laying construction climate requirements: Optimal temperature range is 5-40°C. Considering the thermal expansion and contraction properties of the geotextile membrane, according to experience, the laying should be tighter during cold weather, and looser during hot weather.

Rainy Weather for Wind Turbine Installation: Construction should cease when wind speeds exceed 4 levels or during rain. When the wind is mild, use sand belts to secure the geotextile membrane to prevent sudden gusts from lifting it.

HDPE geomembrane installation: Lay from high to low, do not pull too tightly. Allow for a 1.5% extra width for localized sinking and stretching. The longitudinal joints of adjacent sections should overlap by more than 1 meter.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13181363048