During slope paving, the direction of the film should be generally parallel to the line of greater slope. Before laying the waterproof geomembrane on the slope, inspect and measure the paving area first. Transfer the geomembrane to the anchoring groove platform based on the measured dimensions, and lay it from top to bottom.
Field laying: After the laying area has been checked and measured, proceed with spreading in a certain direction. The laying of HDPE geomembrane should be smooth and straight, whether on the slope or at the bottom of the field, to avoid wrinkles and ripples. Ensure that the two geomembrane sheets are aligned and butted with a joint width of 10-20 cm.



通过中商114认证 
