有卖LNG储罐制作_SupplyPro Co., Ltd._Shandong Zhongjie Special Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shandong Zhongjie Special Equipment Co., Ltd.

Zhongjie Special Tank Co. specializes in the installation services of LNG tan...

Consultation Hotline
15253010956  18769007684

News Center Co., Ltd.

Product Categories
  • No Category

Contact Information
  • Contact person:于秋波
  • Telephone:15253010956
  • 邮件:931369632@qq.com
  • Mobile:18769007684

Home > SupplyPro Co., Ltd. > 有卖LNG储罐制作
有卖LNG储罐制作
品牌: Zhong Jie
Inventory Quantity: 9999
Operating Voltage: 380V
Effective Water Capacity: For detailed inquiries
单价: 1.00/Tai
最小起订Quantity: 1 Tai
供货总Quantity: 9999 Tai
有效期至: 长期有效
最后更新: 2025-05-28 14:43
 
详细Info

Section 1: Equipment manufacturing in compliance with the following regulations and standards

1TSG 21-2016Regulation for Safety Supervision of Fixed Pressure Vessels

2GB150.1150.4-2011"Pressure Vessel"

3NB/T47014-2011"Pressure Equipment Welding Procedure Qualification"

4NB/T47015-2011Welding Procedure Specification for Pressure Vessels.

5GB/T25198-2010"Pressure Vessel Head"

6NB/T47013-2015"Non-Destructive Testing of Pressure Equipment"

7NB/T47016-2011"Mechanical Property Test of Welded Specimens for Pressure Equipment Products"

8JB/T4711-2003Coating and Packaging for Pressure Vessels Transportation              

9GB/T18442-2011"Fixed Vacuum Insulation Deep Chilling Pressure Vessel"

II. Description of Equipment Features, Performance, and Structural Parameters

1Equipment Features

Liquefied Natural Gas (LNG) storage tanks are of horizontal, double-walled cylindrical vacuum powder-insulated structure, with the inner cylinder containingLNGMaterial isS30408The head is made of a standard elliptical head, with the outer cylinder facing the atmosphere, material used isQ345RLow-alloy steel, an eight-point support structure is used between the inner and outer cylinders. Insulation thickness250mmThe inner and outer tube cavities are filled with thermal insulation material Pearl sand insulation material and vacuumed, with the pressure of the inner and outer shell cavities being absolute pressure ≤5PaThe vacuum level at the factory exceeds national standards, ensuring the evaporation rate indicators; the storage tank is equipped with a complete set of operation valves and instruments. These valves and instruments allow for on-site observation of liquid inflow and outflow, as well as pressure and level.

2Performance and structural parameters

Liquefied Natural Gas (LNG) storage tanks consist of the tank body, instruments, pipelines, valves, etc. These tanks are equipped with two types of liquid intake methods, upper and lower, which can be selected and used according to actual conditions.

The inner tank of the Liquefied Natural Gas (LNG) storage tank is equipped with a safety system consisting of dual safety valves. Under normal operation, one set is in operation while the other is on standby. If the operating safety valve trips, the manual pressure relief valve is immediately opened to depressurize below the tank's maximum working pressure. Simultaneously, the safety device is swiftly switched to the standby system via the manual handle, effectively ensuring the tank's safety. This safety system is composed of safety valves, explosion-proof devices, vent valves, and three-way ball valves, which not only reduces pipeline welding but also features excellent fire and static electricity prevention structures. Additionally, the safety relief openings on the housing are fully guaranteed to ensure the entire equipment's safety and reliability. The low-temperature pipeline is centrally extracted for ease of operation and control, and the extraction point is designed with a Dura tube structure to meet low-temperature requirements and minimize stress on the pipeline due to thermal expansion and contraction, ensuring the tank's safety. The vacuum pump valve is equipped with three stages of...OFormed ring seal ensures reliable interlayer sealing, made entirely of stainless steel with a compact size. The top design of the liquefied natural gas tank features a suspension structure for easy transportation, lifting, and installation. The unique manhole design ensures internal cleanliness when the container is sealed. Vacuum isolation valves and combined vacuum gauges are used on the liquefied natural gas tank for easy measurement of the interlayer vacuum level and maintenance, extending the tank's lifespan and enhancing its quality. The tank is equipped with a level gauge and pressure gauge for local display of liquid level and pressure. The interlayer insulation material is high-quality domestic pearl sand, with the following performance parameters of the pearl sand:

Serial Number

Index Name

Unit

Index

1

Loose Bulk Density

Kg/m3

5060

2

Particle size

mm

0.10.2 Not less than80%

3

Thermal Conductivity (at atmospheric pressure),Temperature310-77k

W/m.k.s

0.026

4

Moisture content(Weight)

%

0.1

5

Unexpanded Rate

%

1

6

Temperature

200℃~600

7

PHValue

6.57.5

Section 3: Inspection, Testing, and Acceptance

1Inspect the inner cylinder material, and it can be put into use only after passing the inspection.

2All welds are subject toGB150.1150.4-2011Inspection of standards and drawings is conducted; upon passing the inspectionABWeld-like seam100%Gamma-ray inspectionABCDWeld-like seam100Percent permeability testing with a test report issued

3After the cylinder assembly is completed, proceed to...GB150.1150.4-2011Inspection of geometric dimensions, pipe end orientations, and shape deviations is conducted according to standards and drawings.

4After inspection and approval, conduct a pneumatic test and issue a pressure test report. Upon passing the pneumatic test, evacuate the system. Once the vacuum level meets the requirements, perform a helium leak test.

5After interlayer leak test passes, fill with pearl sand and then vacuum, achieving a vacuum degree ofGB/T18442-2011Standard requirements for the sealed vacuum degree.

Section 4: Technical Documents

1After the contract is signed, the seller shall provide the following technical documents to the buyer:

(1) Certificate of Product Quality for the equipment1Set (provided with the equipment)

Including: Certificate of Material for Main Pressure Components, Material List, Structural Dimensions Inspection Report, Inspection Plan, Product Compliance Certificate, Pressure Vessel Product Data Sheet, Welding Records, Non-Destructive Testing Report, Pressure Test Report, Special Equipment Manufacturing Supervision and Inspection Certificate (Local Inspection Authority), Product Brand Copy

As-Built Drawing Various1Piece (supplied with the equipment)

Section 3: Strength Calculation Documentation1Each (supplied with the equipment)

⑷ User Manual1Each (provided with the equipment)   

⑸ Equipment process flow diagrams and basic reference drawings1Per Unit (Contract Signing)7Available today)

⑹ Certificate of conformity for accessories, instrument calibration report 1Pack (supplied with the equipment)

5. Quality Assurance, After-Sales Service, Technical Support

1Equipment performance meets user requirements and ensures normal operation within the process range.

2Valves and instruments on the storage tank come with a one-year warranty. Free service and repair are provided during the warranty period, and damaged parts are replaced at no cost. The equipment warranty period is from the date of delivery.12Month(s).

3During the warranty period, if our manufactured equipment encounters issues on-site: if the issue is due to manufacturing defects, we will respond to the customer's formal notification within our normal working hours.2Hourly response24Within hours, our professional technicians will arrive on-site to address the issue. Service personnel will not leave the scene until the fault is resolved. Replacement parts are free during the warranty period; beyond that, only cost-based charges apply.

4During the equipment operation, if a fault occurs, the seller shall address the issue first and then determine liability, with the principle being to ensure the normal operation of the equipment.


  1. Supplier provides lifetime technical consultation, answering users' questions at any time.




60-cubic-meter Liquefied Natural Gas (LNG) storage tank approval procedures, 60-cubic-meter LNG storage tank, complete accident status analysis and prediction for the monitoring area based on monitoring data, operational control over process safety and emergency response, implement disaster relief plans; the level gauge should be repairable or replaceable under tank operation conditions; density variations must be considered during selection; a densimeter may need to be added if necessary, monitor the liquefied stratification inside the tank to prevent "upset" occurrences.

60-cubic-meter Liquefied Natural Gas (LNG) Storage Tank Approval Procedures, 60-cubic-meter LNG Storage Tank, Storage of LNG ① Determination of Storage Tank Volume: The total tank volume is typically determined based on the average daily gas consumption during the 3-7 peak days of the month, and should also consider factors such as the number of long-term gas supply sources, maintenance schedules, transportation cycles, and fluctuations in customer gas usage. Industrial gas consumption should be determined based on the nature of the gas-consuming equipment and specific production requirements.

60-cubic-meter Liquefied Natural Gas (LNG) tank, how many tons for a 60-cubic-meter LNG tank, 2) how many tons for a 60-cubic-meter LNG tank with slanted holes, application procedures for a 60-cubic-meter LNG tank, when storing low-temperature liquids, the filling rate must not exceed 0.95, and overfilling is strictly prohibited.

Application procedures for 60-cubic-meter LNG storage tanks, 60-cubic-meter LNG storage tanks, and jacketed vacuum powder-insulated pressure vessels for storing and supplying low-temperature liquefied gases (such as liquid nitrogen, liquid oxygen, liquid argon, liquid carbon dioxide, LNG, etc.) may all experience low-temperature frostbite incidents.

Pressure increase requires immediate closure of the lower inlet valve for the 20 cubic LNG storage tank. The vacuum degree of the 20 cubic LNG storage tank is good. Insulating materials should not cause corrosion to the pipelines and equipment.

60-cubic-meter LNG storage tank with what size vaporizer, approval procedures for a 60-cubic-meter liquefied natural gas storage tank, the nationwide promotion and application of LNG, and how to effectively manage the safety and technical aspects of LNG have become a new issue. (3) Cautionary Notes: a) During the operation of the LNG storage tank, it is mandatory to ensure the liquid level is ≥15%.





Where can I buy LNG tanks for sale - What are the best brands of known LNG tanks - Where to find quality LNG tank suppliers - Professional LNG tank for sale
询价单
 Click submit means you agree to《Service terms》《Privacy policy》

18769007684