External power supply must be secure, and the layout should be reasonable and safe.
When starting machines for pressure boosting or oil extraction, the top plate must be fully closed. When removing the cakes, the top plate must be fully opened.
3. If an abnormality is detected during operation, please shut down the equipment for inspection. Check for loose hydraulic system and motor drive補位 screws, and for any oil leakage in the pipelines.
4. At the end of each workday, please promptly clean the inside and outside of the material drum to prevent oil residue from blocking the oil seams.
5. When the squeezing process ends and you remove the cake, be cautious not to raise the plunger too high to prevent hydraulic oil from spilling out.
6. Add the specified hydraulic oil brand, and regularly filter and clean the oil tank. If a decrease in hydraulic oil is noticed, it should be replenished promptly.
7. If the pressure gauge is functioning abnormally, operations should be immediately halted, and staff should be notified for inspection.
8. Prior to machine testing, users must properly ground the housing or neutral wire according to local power grid regulations.
9. Do not私自 open electrical cabinets or oil tank lids during the operation of the equipment.





