Utilizing concrete pipes requires a methodical approach.
The use of cement pipes requires proper methods. Next, let's hear from Tangshan Cement Pipe Factory as they educate us on the relevant knowledge.
1. Check all components for proper operation before use. Confirm that all hoses are securely connected.
When in use, strictly adhere to the specifications in the main parameters; avoid overloading, and do not continue to compress after reaching the travel limit. Otherwise, severe oil leakage from the cylinder top may occur when the lifting height or lifting position exceeds the规定的.
3. In case the oil level in the pump body is insufficient, working oil (32# hydraulic oil) must be added to the pump before it can operate.
4. Please refer to the instruction manual for the electric pump.
5. When lifting heavy loads, it's crucial to choose a moderate center of gravity. Select a reasonable point of application for the electric jack, ensuring the base is leveled. Also, consider the ground's hardness and whether to use sturdy wood as a pad to ensure stability, preventing sinking or tilting under the load.
After an electric jack has lifted the heavy object, it should be promptly supported firmly with a stabilizing device, and it is strictly prohibited to use the electric jack as a support.
We hope the above introduction is helpful to you all, and we look forward to collaborating with you.