How to Lay Cement Pipes Without Damage?_News Center Co., Ltd._Tangshan Yulin Cement Products Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Tangshan Yulin Cement Products Co., Ltd.

Deep Well Pipes, Drainage Pipes

13831503907 15630515444
  
Product Classification Co., Ltd.
  • No Category

Contact Information
  • Contact person:周总
  • Telephone:13831503907
  • Mobile:15630515444
Home > News Center Co., Ltd. > How to Lay Cement Pipes Without Damage?
News Center Co., Ltd.
How to Lay Cement Pipes Without Damage?
Publish Time:2024-08-07        View Count:17         Return to List

Concerns often arise about wear during the laying of cement pipes. How should one handle and resolve wear issues during cement pipe laying? Below, the editor from Xiangrui Cement Pipe Factory in Fengrun District, Tangshan City, provides a detailed explanation.

When concrete pipes need to pass through a floor, they should be set. If it's a thick floor, holes need to be drilled or pipes pre-buried. The hole diameter should be larger than the concrete pipe.
50 to 100 mm in diameter. When cement pipes are used as drainage pipes, they cannot be contaminated by sediments, flues, and...

Air pipeline approved. If cement pipes pass through these areas, it is recommended to promptly take corresponding technical measures to prevent cement pipe cracking.
Translation: Fracture.

When laying reinforced concrete pipes, anti-corrosion treatment is required. The cement pipes need to be fixed at a level of meters, with the horizontal spacing not exceeding...
3M. The pipe clips should also be installed on the suspended pipe collection bracket at the vertical joint. During the installation process of the concrete pipes.

Due to the varying specifications of cement pipes, the installation requirements also differ, making them suitable for prototype construction. In summary, there are discrepancies in all aspects.

Cement pipe installation requires excavation and treatment of the foundation pit. Excavation and treatment are performed according to the required depth and alignment for the cement pipe installation.
After completing the foundation pit work and upon inspection, ensuring it meets the load-bearing requirements for cement pipes, proceed.

Pouring concrete. Pay attention to the flatness and pouring precautions during the concrete pouring process.

During the installation of concrete pipes, pay attention to the connection of the pipe joints to prevent improper or loose connections.