Extruded polystyrene installation requires stringent conditions._News Center Co., Ltd._Hangzhou Yuebaon Technology Co., Ltd.
欢迎来到Hangzhou Yuebaon Technology Co., Ltd.!
  • Sales Hotline:13175067252  15968829926


Company Information

Location:Zhejiang/Hangzhou

会员级别:采商通4

身份认证:    

我的勋章:  通过中商114认证

Business Card

  • 公司名称Hangzhou Yuebaon Technology Co., Ltd.
  • 联 系 人江丕芝 (先生)
  • 公司电话13175067252
  • 手机号码15968829926
  • Company AddressZhejiang Province, Hangzhou City, Linping Economic and Technological Development Zone, Xinbei Qianjiang International Building, Building 3, Room 601-2

更多Product Classification Co., Ltd.
  • No Category

更多Contact Information
  • Contact person:江丕芝
  • Telephone:13175067252
  • Mobile:15968829926
Home > News Center Co., Ltd. > Extruded polystyrene installation requires stringent conditions.
News Center Co., Ltd.
Extruded polystyrene installation requires stringent conditions.
Publish Time:2022-12-01        View Count:20        Return to List

Expanded polystyrene boards possess properties such as moisture resistance, impermeability, light weight, corrosion resistance, low thermal conductivity, high compressive strength, aging resistance, long service life, and low thermal conductivity. The thermal insulation characteristics of expanded polystyrene boards have determined their wide application in the construction industry. To harness  Great energy demands adherence to regulations, and the construction conditions for extruded polystyrene panels are very strict. Specific requirements are as follows:

The foundation walls have passed the acceptance inspection. The door and window frames, as well as various入户 pipelines, water drain brackets, and embedded parts on the walls, have been installed according to the design.

2. The flatness of shear walls is checked using a 2-meter rule.  Large Deviation Exceeds4 hours to apply 20mm thick 1:3 cement砂浆leveling.  Large deviation less than4-inch uneven areas were patched with 1:3 cement mortar to even out the surface.

3. Leveling the masonry walls with 20mm thick 1:3 cement mortar.

The base wall and leveling layer should be dry.

The construction site temperature and wall surface temperature must not be lower than 5℃ within 24 hours after construction, and the wind speed should not exceed 5 levels.

6. Effective measures should be taken to prevent rainwater from washing away the walls during summer construction.

 