Ductile Iron Pipe_SupplyPro Co., Ltd._Jin Cheng Xin Fu Xing Casting Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Jin Cheng Xin Fu Xing Casting Co., Ltd.

Ductile Iron Pipes, Ductile Iron Pipe Fittings, Flexible Cast Iron Drain Pipe...

Soule Star Diamond Member
Consultation Hotline
13100067565  17335861688

News Center Co., Ltd.
  • No News

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Ductile Iron Pipe
Ductile Iron Pipe
品牌: XinfuXing
Material: Ductile iron balls
Processing Services: Deep processing
Color: Black
单价: 2200.00/ton
最小起订Quantity: 1 ton
供货总Quantity: 9999 ton
有效期至: 长期有效
最后更新: 2023-06-19 14:14
 
详细Info

Below is the preparation for installing ductile iron pipe fittings:

One, complete all aspects of the foundation engineering design, while also accomplishing the following tasks:

(1) Basic control lines and basic datum elevation lines have been marked.

(2) Composite foundation and pile foundation have been inspected and certified by the testing unit.

(3) The ground treatment plan must have an approval document.

Two, after the foundation engineering was completed, the construction unit conducted a quality check on the project's construction quality, confirming that it complies with relevant laws, regulations, and mandatory construction standards, as well as the requirements of the design documents. A construction quality report (foundation) was submitted, reviewed and signed by the project manager and relevant responsible persons of the construction unit.

Three, the supervisory unit has conducted a quality assessment of the foundation engineering, possesses complete supervisory documents, and submitted the Tianjin Construction Project Foundation Acceptance Supervision and Evaluation Report, which has been reviewed and signed by the chief supervisory engineer and relevant responsible persons of the supervisory unit.

Four, the survey and design units have inspected the survey and design documents, as well as the design change notices signed by the design unit during the construction process. They have also proposed that these be reviewed and signed by the project survey and design supervisor, as well as relevant responsible persons from the survey and design units.Quality Inspection ReportEngineering quality inspection reports of the surveying unit and the design unit;

Five, equipped with comprehensive technical files and construction management documents, meeting the quality file archiving requirements of Tianjin Construction Quality Supervision and Management Center.

Six: All issues rectified under the supervision of the District Planning and Construction Administration and its delegated District Construction Quality Supervision Station.