Clean Sheet_SupplyPro Co., Ltd._Yacreate (Nantong) New Materials Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Yacreate (Nantong) New Materials Technology Co., Ltd.

Inorganic Pre-coated Boards Manufacturer, Quartz Fiber Boards, Antimicrobial ...

Consultation Hotline
17717272216  13482835518

News Center Co., Ltd.
  • No News

Product Categories

Contact Information
  • Contact person:王永强
  • Telephone:17717272216
  • Mobile:13482835518
Home > SupplyPro Co., Ltd. > Clean Sheet
Clean Sheet
品牌: Yachen
Shipment: National
Supply Quantity: 99999
Shipment Time: Timely shipment
单价: 100.00/None
最小起订Quantity: 1 None
供货总Quantity: 9999 None
有效期至: 长期有效
最后更新: 2024-04-13 11:22
 
详细Info

Detailed Description:


Clean SheetStorage and handling

Inorganic Pre-Painted BoardPrior to installation, the original factory packaging should be retained as much as possible and stored indoors. If stacked outdoors, the location must be level, free of standing water, and should not be under cranes or heavy loads. Place wooden blocks beneath the boards to elevate them by 20 cm, and insert soft materials between the boards. Group boards of the same type together, and each stack should have an easily identifiable type label on the boards, covered with a waterproof tarp. Set up temporary fencing around the storage area to prevent unnecessary damage to the boards from pedestrian traffic.


Clean panel installation

The installation of inorganic pre-coated panels typically uses mobile scaffolding. In ensuring the load-bearing capacity of the construction scaffolding, it is also necessary to consider:

(1) Distance between the curtain wall, work surface, and axis.

(2) Identify the spacing and location of the control points by referencing the reference surface, and pay attention to line of sight.

(3) Identify the spacing between installation angles by referencing the reference surface.

(4) Horizontal difference from controlled elevation;

(5) Vertical spacing from the building and spacing between each floor.

When handling inorganic pre-coated panels, lift from both ends simultaneously to prevent damaging the surface oxide film or coating. When installing wall panels, only lift one panel at a time. Use the manufacturer's specialized clamps to lift the panels at two points along the length of the wall panel. Lift slowly, control with a wind rope to avoid碰撞 with installed panels, and wrap the protruding parts of the scaffolding with soft materials.



询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13482835518