公司主营:Mobile Home Recycling, Mobile Home Construction, Mobile Home Rental
13915268882

Product Center
Company Qualification
Mobile Home Construction, Color Steel Mobile Home Construction, Construction Site Accommodation, Strong Structure
Details Introduction
Mobile homes are temporary structures widely used in construction sites, municipal projects, road construction, mining operations, and more. To ensure the quality and safety of mobile home construction, the construction process and steps are crucial. Below, I'll introduce the construction process and steps of a mobile home installation company.
Pre-construction preparations
1. Determine the construction site and usage: The construction site for portable buildings should be flat and spacious, free of underground pipelines, high-voltage lines, and other obstructions. Additionally, clarify the purpose and function of the portable building to select the appropriate materials and structural types.
2. Prepare materials and tools: Prepare the materials and tools for the prefabricated house construction according to the construction plan and design requirements, including steel, aluminum alloy, glass, paint, screws, etc., as well as cutting machines, welders, and hand hammers, etc.
3. Design and Drafting: Create designs and drawings based on customer requirements and site conditions, determining the details such as size, structure, materials, and colors of the portable building.

赵经理 (Mr.)
13915268882
13915268882
569886857@qq.com
30 Xishan Development Zone Houqiao Trading New Street
b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930