Home > News Center Co., Ltd. > 4 Methods for Aluminum Composite Panel Installation and Construction Process
News Center Co., Ltd.
4 Methods for Aluminum Composite Panel Installation and Construction Process
Publish Time:2023-08-15        View Count:92        Return to List

Method 1 for Aluminum Composite Panel Installation:

Unrolling → Connecting to the skeletal framework → Securing the skeletal framework → Installing aluminum panels → Sealing construction treatment → Inspection → Connecting to the skeletal framework → Securing the skeletal framework → Installing aluminum panels → Sealing construction treatment → Inspection.

Method Two for Aluminum Composite Panel Installation:

(1) Stake out, secure the framework, and pull the framework into position on the subgrade. The framework is fixed to the main structure, and the quality of the main structure should be checked before staking out.

Section II: Fixed Skeleton Connectors

Welding connection components to secure the skeletal framework on the columns of the main structure.

(III) Fixed Skeleton

The frame will undergo anti-corrosion treatment. The installation of the frame is accurate and the joints are secure. After installation, inspect the line and surface elevations. To ensure the precision of the board installation, it is advisable to use a theodolite to traverse the horizontal and vertical frame members. Properly handle the expansion joints, settlement joints, and varying cross-sections to meet the requirements for use.

(4) Aluminum Panel Installation: The installation and fixation of aluminum panels must be secure and reliable, as well as easy to perform.

1. The gaps between the boards must be internally treated for a smooth and even finish.

2. Aluminum sheets have been installed, and protective coverings made of plastic film or other materials have been applied to areas prone to contamination.


Method 3: Aluminum Composite Panel Installation

The aluminum plates and accessories are transported vertically to various construction sites using elevators and other vertical transportation equipment.

2. Clean the interior side of the aluminum panel and the surface of the column frame with a cleaning agent.

3. The solid aluminum panel is connected to the frame by means of aluminum corner codes (hanging ears) around its perimeter, securing it to the frame.

4. For fixed installations, if it's an internal seamless joint, you can drill holes at the corresponding positions on the frame using an electric drill, and then rivet with flat-head ( countersunk ) aluminum pull rivets. If the external installation has a gasketed floor, you can directly fix the aluminum panel by drilling through the connection holes of the aluminum angle code with steel swivel screws (also known as flange screws or bird's head nails, see Figure), but be mindful to control the tightness of the drill bit to adjust the aluminum panel sections.

5. Aluminum sheets are brought in for trial assembly. First, the aluminum sheets are slightly secured to the frame, with attention to installation precision control. Adjust the panels before final tightening.

6. When installing aluminum panels, mount them on the wall in the order of their numbering.

7. Aluminum panel installations commence from the front, large areas, and corner sections, adhering to the principle of mounting from top to bottom.

8. The connection between the aluminum plate and the frame must meet the requirements of the drawings, ensuring it is firm and reliable; no bolts should be omitted.

9. The connection structure at the corner of the curtain wall and surrounding walls, as well as the upper and lower sealing joints, and the treatment of expansion joints, should comply with the design requirements.

10. Node Construction and Finishing Work

① Wall Panel Joints: It is common to encounter issues such as uneven alignment or不平的board surfaces at the junctions. Therefore, it is advisable to first install one side of the board, align it, and use horizontal and vertical control lines to determine the installation position of the other side. Once both sides meet the required standards, proceed to sequentially remove the nail, and install the clamping plate for fixation.

② The lower end of the wall is treated with a seal, a water-blocking panel is custom-made according to the actual dimensions to cover the bottom, simultaneously covering the gap between the panel and the wall to prevent rainwater from渗入室内.

When installing, pay attention to the gaps between panels and the height requirements at the panel interfaces.

12. Aluminum panels have been installed. In areas prone to contamination, protective coverings such as plastic film or other materials have been applied.

Method Four: Aluminum Composite Panel Installation

Proper Installation of Aluminum Composite Panels: While the selection of aluminum composite panel materials is crucial, many overlook the importance of their installation. It's actually a mistake to do so. The quality of the aluminum composite panel material is important, but only correct installation can truly showcase its benefits and prevent potential hazards or frequent maintenance issues in living spaces. We have prepared the correct installation methods and steps for you.

1. Install the edging corners at the same level.

2. Various requirements call for different frameworks, such as L50*50*5mm angle iron fixation, pre-buried aluminum hanger fixation, etc., with different fixation methods for different products.

3. The hanging pieces pre-installed on the clip joists are fastened vertically beneath the light steel joists, with the clip joists tightly attached. The spacing of the clip joists is determined by the size of the panels. After all installations are complete, they must be adjusted to a level position.

4. Attach the panel in sequence to the frame, pressing down the locking strip after each piece. Connect the frames using the connecting components when joining.

5. Always wear gloves when installing the panel. In case of accidental fingerprints or stains, they can be cleaned with dish soap and wiped dry.

Xinjiang Xixiang Aluminum specializes in aluminum single panels, double-curved aluminum panels, space cabins, and an array of products including anodized, perforated, embossed, wood grain, and stone grain aluminum panels, aluminum profiles, and aluminum honeycomb panels. As a one-stop service manufacturer of aluminum panels, we offer a diverse range of products, extensive construction experience, and welcome customers to contact us for cooperation!