What is the installation process for mobile folding house manufacturers?_News Center Co., Ltd._Xinjiang Songbai Integrated Housing Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Xinjiang Songbai Integrated Housing Co., Ltd.

Collapsible Houses | Collapsible Box Houses | Rental of Collapsible Box Houses

13565969685
 

News Category
  • No Category

Contact Information
  • Contact person:谢芳
  • Telephone:13565969685
  • Mobile:13565969685
  • Address:1297 Yingbin Road, 2nd Floor, 218-B084, Xinjiang Aviation Oil Building, Xinxiang New District, Urumqi, Xinjiang
Home > News Center Co., Ltd. > What is the installation process for mobile folding house manufacturers?
News Center Co., Ltd.
What is the installation process for mobile folding house manufacturers?
Publish Time:2024-05-23        View Count:22         Return to List

Editor's Analysis: Understanding the Installation Process of Mobile Folding Houses. As we all know, it takes about three to five months to build a brick-and-mortar house, with larger structures requiring more time. In contrast, the popular collapsible container mobile houses in the temporary construction industry can be assembled in just three minutes, requiring only two people to operate. They are convenient and quick, suitable for temporary housing in fields such as construction, railways, and highways, and can also be used as permanent structures, such as integrated cafes, apartments, and hotels. Below, we take a look at the installation analysis of the collapsible container mobile houses from Hebei Baiming Sheng Integrated House Co., Ltd. It is important to keep non-employees away from the installation area to avoid injury during the assembly of the collapsible container mobile houses.

Step one: Check the stability of the steel wire rope, hoist the main frame, and after it is evenly spread out, place a support rod in the middle of the box to maintain stability.

Step two: Push open one wall, tighten the screws, then push open the other wall with doors and windows and tighten the screws.

Step 3: Hoist the collapsible container to the pre-determined installation location, and carefully lower it down once it's confirmed that there are no people around.


 Click submit means you agree to《Service terms》《Privacy policy》

13565969685