There are mainly several methods for laying the three-dimensional composite drainage net:
Mechanical LayingThe laying is carried out using professional machinery, ensuring high efficiency.
Artificial LayingThrough manual laying, attention must be paid to the evenness of the laying and the tightness of the joints.
Welding FixationFor areas requiring enhanced connection, welding can be used for stabilization.
During the installation process, ensure that the drainage network is laid in the correct direction and that the joints are secure and reliable to guarantee its drainage effectiveness.