Minhang Guanghua Road Park_Product Center Co., Ltd._Shanghai Xiangshi New Material Co., Ltd.
Shanghai Xiangshi New Material Co., Ltd.

Custom Color Concrete Engineering for Sponge City Projects

13681984058 13816407068

Minhang Guanghua Road Park

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Shanghai
有效期至:
长期有效
最后更新:
2024-06-20 15:23
Product Details

Origin

Dimensions

Customized

Material

Negotiable

Permeable concrete


Definition

Ecological permeable concrete, also known as drainage concrete, is a new type of eco-friendly paving material made by mixing small gravel, high-grade concrete, water-permeable admixtures, water, colored reinforcing agents, and stabilizers in a certain proportion. It is formed by a layer of thin paste on the surface of coarse aggregates that bond together in a honeycomb structure, allowing rainwater to infiltrate the ground and effectively replenish groundwater. It also effectively eliminates the environmental hazards caused by pollutants like oil compounds on the ground. With its vibrant colors and aesthetic integration, it contributes to a harmonious urban environment, protecting nature, maintaining ecological balance, and mitigating the urban heat island effect.


2. Permeable Concrete Construction Process

1. Mixing: Blend cement and aggregates in a proportion using a mixer to create a well-mixed material.


2. Pouring: Prior to pouring, the subgrade must be moistened with water. Otherwise, rapid water loss from the permeable concrete will decrease the bond strength between aggregates. Simply spread the material evenly over the subgrade.


3. Vibration: Avoid excessive vibration and tamping during the pouring process.


4. Compaction: After vibration, further compaction should be achieved using solid steel pipes or light compaction rollers, to flatten and ensure permeability of the concrete mixing material.


5. Maintenance: Due to its numerous pores, permeable concrete is prone to water loss and dries quickly, thus requiring film covering for maintenance.


6. Finished Product: The film curing time for permeable concrete should be no less than 7 days, followed by applying a layer of specialized permeable concrete sealant.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13681984058

Back to Top