Hebei Handan Yuanbo Garden_Product Center Co., Ltd._Shanghai Xiangshi New Material Co., Ltd.
Shanghai Xiangshi New Material Co., Ltd.

Custom Color Concrete Engineering for Sponge City Projects

13681984058 13816407068

Hebei Handan Yuanbo Garden

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Shanghai
有效期至:
长期有效
最后更新:
2024-06-20 15:23
Product Details

Origin

Dimensions

Customized

Material

Negotiable

Permeable concrete


1. Definition

Eco-porous concrete, also known as drainage concrete, is a new type of environmentally friendly paving material made by mixing and blending small gravel, high-grade concrete, water-permeable admixtures, water, colored reinforcing agents, and stabilizers in a certain proportion. It is formed by a layer of thin paste coating the surface of coarse aggregates, creating a honeycomb structure that allows rainwater to seep into the ground, effectively replenishing groundwater. It also effectively eliminates the environmental hazards caused by oil compounds and other pollutants on the ground. With its vibrant colors and landscape integration, it contributes to a more harmonious urban environment, protecting nature, maintaining ecological balance, and alleviating the urban heat island effect.


2. Permeable Concrete Construction Process

1. Mixing: Blend cement and aggregates in a mixer to achieve a well-mixed material in proper proportions.


2. Pouring: Prior to pouring, the subgrade must be moistened with water. Otherwise, the rapid loss of moisture in the permeable concrete will reduce the bonding strength between aggregates. Simply spread the material evenly on the subgrade.


3. Vibration: Avoid excessive vibration and compaction during the pouring process.


4. Rolling: After vibration compaction, further compacting and leveling should be done using solid steel pipes or light roller compactors, for the permeable concrete mixing material.


5. Maintenance: Due to its numerous pores, permeable concrete is prone to water loss and dries quickly, thus requiring film covering for maintenance.


6. Product: The film curing time for permeable concrete should be no less than 7 days, followed by applying a layer of specialized permeable concrete sealant.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13681984058

Back to Top