Introduction to Key Construction Points of Flexible Slope Protection Mesh_News Center Co., Ltd._Anping Ji Zheng Wire Mesh Products Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Anping Ji Zheng Wire Mesh Products Co., Ltd.

Slope Protection Netting, Active Protection Netting, Passive Protection Netting

Consultation Hotline
18330250444

Product Categories
Home > News Center Co., Ltd. > Introduction to Key Construction Points of Flexible Slope Protection Mesh
News Center Co., Ltd.
Introduction to Key Construction Points of Flexible Slope Protection Mesh
Publish Time:2022-05-17        View Count:27        Return to List

Introduction to Key Construction Points of Flexible Slope Protection Mesh

(1) Construction sequence: slope clearing and leveling → erection of scaffolding → installation of anchor bolts → shotcrete application → hanging of wire rope mesh → anchor sealing.

(2) This project involves treating an old roadside slope, which requires high-altitude construction work for the slope. Anchor bolt installation necessitates the use of scaffolding. It is essential to scientifically and reasonably arrange the construction plan during the process.

During the main body construction period, the highway may be closed for traffic. Interim traffic control with alternating closures will be implemented when clearing hazardous rocks.

(4) Slope clearing is conducted from top to bottom, while scaffolding and construction anchors are installed from bottom to top. Netting and fixation are done from top to bottom.

(5) Strict safety and protective measures must be in place during construction, and waste materials should be disposed of properly.

(6) Construction teams should take appropriate measures to minimize damage to the original road surface.

Avoid construction during rainy weather as much as possible.

(8) When hanging over the slope, it is necessary to set appropriate warning signs prohibiting climbing as required.

(9) During slope clearing, ensure comprehensive safety measures are in place. Clear the area thoroughly by removing loose and overhanging rocks, and for cracks, clear the surface strongly weathered layer to avoid any hidden hazards.