Yellow Rust Stone Construction: Points to Note_News Center Co., Ltd._Yisheng Stone Sales Co., Ltd. of Wenshang County 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Yisheng Stone Sales Co., Ltd. of Wenshang County

Yellow Limestone, White Limestone, Odd-shaped Stone, Golden Marble, Curbing S...

Consultation Hotline
13792346975

Product Categories

Contact Information
  • Contact person:王宜生
  • Telephone:13792346975
  • Mobile:13792346975

Home > News Center Co., Ltd. > Yellow Rust Stone Construction: Points to Note
News Center Co., Ltd.
Yellow Rust Stone Construction: Points to Note
Publish Time:2023-11-25        View Count:18        Return to List

To gain an in-depth understanding of the knowledge required during the construction of Yellow Rust Stone, please refer to the following article.

The appearance and color of Yellow Rust Stone vary: prior to construction, selection and trial assembly of Yellow Rust Stone should be conducted to ensure the color consistency and harmony of the wall after the stone installation.

2. Ensure straight lines are properly curved and stitching is even: During construction, strictly adhere to the dimensions specified in the construction installation drawings, verify the specifications of the structural line, and lay out the lines in sections by layers. Regularly check and calibrate the levelness and flatness to ensure the straight lines are smooth and the stitching is uniform and even.

3. Strictly prevent water leakage: Staff must be meticulous and attentive in applying sealant and filling gaps, especially around the openings of external door frames, the junctions of building facades where convex and concave changes occur, the connections of different materials, expansion joints, balconies, and areas where overhanging structures meet walls. This ensures both a leak-proof result and an aesthetically pleasing building.

4. To effectively prevent wall contamination and minimize residual adhesive marks, it is imperative to establish a practical and feasible construction process specification prior to the start of work. Pay attention to the construction sequence, ensure the technical measures are further viable and executable, prioritize the people-oriented approach, and also implement measures for civilized construction. Ensure that there are effective safeguards for the finished products. Cultivate good habits among construction workers in cultural and educational practices, for both on-site cleaning and product cleanliness.