Yichengxing Environment Engineering Co., Ltd. in Xinjiang is a professional m...
产品Price Negotiable
最小起订Quantity: 供货总Quantity:
High-rise column advertising production, building signages, and facade illumination projects! For the actual construction of tall columns, equip with the necessary machinery and equipment, skilled technical workers, and based on the strict fulfillment of contract documents. Adhering to the principle of resource optimization, select and configure a complete set of professional machinery and detection instruments according to the overall construction plan and detailed construction methods for this project. Provide an adequate number of professional construction teams and skilled technical workers to ensure the progress, quality, and safety of the construction. Construction projects require a large quantity of materials, including major purchased items like cement, wood, and steel, as well as bulk local materials such as sand and gravel. The materials department actively procures and supplies these, extensively investigates material sources, diversifies supply channels, organizes the delivery based on material usage plans, ensures the project's needs are met, and concurrently works with the testing department to maintain quality control over incoming raw materials. Under the leadership of the Project Chief Engineer, in accordance with the construction regulations and rules based on the project method, combined with the characteristics of the project, and in accordance with the company's construction technology management regulations, practical and feasible technical management measures are formulated. These measures are to be implemented and supervised by the Project Chief Engineer. The main content is as follows: Gather meteorological, topographical, hydrogeological conditions to provide necessary basis for compiling special construction plans and guiding construction. Promptly organize relevant personnel to familiarize themselves with design drawings, understand design intentions and related details, clarify quality requirements, and verify issues and doubts on the drawings. Actively cooperate with the owner and design department to complete design drawing handover before construction, aiming to resolve issues on the drawings as much as possible before the project starts.

Phone Consultation